Laserfiche WebLink
SMITHROUPPR <br />by Notre Dame through its hydro project efforts. There may be utilities that LIND will not impact, and may <br />need relocation or modification for the Seitz project, <br />• Stormwater management for the park — it is assumed that temporary stormwater management, erosion and <br />sedimentation control will be accommodated by Notre Dame's hydro project. The SmithGroupJJR team will <br />modify the SESC and stormwater management, as needed, to align with the park's reconstruction. <br />• Surface improvements, including walks, riverfront promenades, plazas, parking restoration, performance <br />plazas and stage, seating, site walls and planters. <br />• Furnishings, including railings, benches, trash containers, bike loops, bollards and lighting. <br />• Plantings and landscape elements, including trees, shrubs, perennials and ground cover, and soft -surface <br />stabilization. In addition, the SmithGroupJJR team will provide irrigation design for Seitz Park and water <br />utility connection to existing infrastructure. <br />• Buildings, including park buildings/restrooms/ad min istration/retail space, within the proposed park building <br />and stage/canopy structures. The building required of Notre Dame has been sited, and a finish floor <br />elevation established by SmithGroupJJR, The architecture, engineering and utility needs for this building <br />will, be designed, and implemented by Notre Dame. Our Architecture Team will consult with Notre Dame on <br />design elements to ensure the building meets the image expectations, of Seitz Park. <br />• Miscellaneous elements such as screening, River Lights reinstallation coordination, riverfront promenade <br />stabilization and railings. <br />• Lighting design, including photometrics, compatibility with RiverLights and site lighting. <br />The intent is that the SmithGroupJJR team will provide complete services through the implementation of the project. <br />Our team structure and roles of each team members are as follows, <br />Project Limits and Boundaries <br />The Seitz Park Reconstruction project will include the following: <br />Schematic Design Project Limits (refer to A ffachment Q) <br />• Seitz Park Proper — including park areas comprising the peninsula south of the Wharf Partners development <br />and Stephenson Mills Apartments, and open space located east of Stephenson Mills along the East Race <br />from Colfax Avenue to the park proper. <br />• Riverfront Promenade along the St. Joseph River, west of the Wharf Partners development, from Colfax <br />Avenue to the park proper, <br />• Gi,ntz Avenue, from Colfax Avenue to the park proper. <br />• East Race riverfront promenade <br />• Proposed crossing of East Race (for new pedestrian bridge) including areas south of AM General and the <br />City -owned parking lot, east to Niles Avenue (no streetscape included along Niles), <br />• Riverl'ront Trail at Colfax Avenue for proposed crossing. Area encompassed includes Colfax Avenue ROW <br />located east of bridge and intersection of Sycamore Street and trail connection along Colfax Bridge to West <br />Bank trailhead at Colfax and MLK <br />• Improved connection along the East Bank trail along the river between Seitz Park and Howard Park <br />Anticipated First Phase Implementation — DD through CA <br />The project limits and boundaries for the tasks and phases beyond Schematic Design Tasks 1 and 2 will be <br />defined once the project design and budget have been established. <br />City of South Bend, Indiana Seitz Park Redevelopment Final Design and Implementation SmithGroupJJR <br />South Bend, Indiana <br />LETTER FORM PROPOSAL -2- Revised 11130117, 1110912017, 10/1612017 <br />