My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - SmithGroupJJR - Schematic Designs for Various Pedestrian Crossings
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - SmithGroupJJR - Schematic Designs for Various Pedestrian Crossings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:13:13 AM
Creation date
12/13/2017 3:37:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SMfTHGAOUPN <br />ATTACHMENT A <br />October 16, 2017 <br />Revised November 9, 2017 <br />Revised November 30, 2017 <br />Ms. Kara Boyles, City Engineer <br />City of South Bend <br />Public Works Division of Engineering <br />227 West Jefferson Boulevard, Suite 1300N <br />South Bend, Indiana 46601 <br />RE: Seitz Park Redevelopment Final Design and Implementation <br />Dear Ms, Boyles: <br />On behalf of SmithGroupJJR, Inc., ("SmithGroupJJR") I am pleased to submit this proposal for the design, <br />engineering and implementation of Seitz Park along the St, Joseph River in downtown South Bend, The following is <br />our understanding of the services which are to be provided, <br />PROJECT DESCRIPTION, TEAM AND APPROACH <br />SmithGroupJJR has been working with the City of South Bend ("CITY") on the Riverfront Parks and Trails plan and is <br />positioned to implement the priority projects identified along the riverfront, it is necessary to develop final design <br />plans for Seitz Park so it can be moved into implementation in concert with the Notre Dame hydro -electric project, <br />currently working through the FERC approvals and permitting. Additionally, coordination with the Development Team <br />for the Howard Park is required to ensure the needs of Seitz Park are met, including the riverfront connection <br />coordination with Wharf Partners related to the Riverwalk connection to Colfax <br />SmithGroupJJR will serve as the CITY's Lead Consultant for final design, engineering and! construction <br />administration services. In addition, SmithGroupJJR will coordinate the efforts of other professional services <br />(geotechnical, survey), and facilitate any necessary agency, permitting, or stakeholder meetings to ensure the <br />successful completion of the project. We will partner with a local engineering firm, DLZ, to aid in the project and <br />maintain a local presence throughout the implementation of the project, We will also partner with a local architect, <br />EPOCH, to serve as the building architects and engineers, and Abonmarche will serve as the project surveyor. <br />The main elements of this project include: <br />• On -going coordination with Notre Dame as they finalize their design and implement the hydro project. On- <br />going coordination with the Development Team, Wharf Partners for the Cascades project north of Seitz <br />Park. <br />• Coordination with other adjacent land owners and land users, including American General, Stephenson Mills <br />and agencies including, but not limited to, the Indiana Department of Natural Resources (IDNR) to ensure <br />the park is designed to accommodate the on -going uses and utilizes lands as needed for programming, <br />connectivity and circulation. <br />• Coordination of supplemental survey and geotechnicali engineering as needed to design the park elements. <br />• Underground and overhead utility coordination with service providers to serve the infrastructure needs of the <br />park — it is assumed all utility modifications, relocations and extensions of the existing site will be provided <br />City of South Bend, Indiana Seitz Park Redevelopment Final Design and Implementation SmithGroupJJR <br />South Bend, Indiana <br />LETTER FORM PROPOSAL - I - Revised 11130117, 1110912017, 10/16/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.