My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/28/1952 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1952
>
07/28/1952 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:47:07 AM
Creation date
11/9/2017 9:34:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/28/1952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A petition was received for the improvement of South 34th Street between East <br />Jefferson Boulevard and East Washington Avenue, and also one for the improvement of <br />Chalfant Street, between Arthur and Walsh Streets, were examined and referred to the <br />City Engineer for investigation and report. <br />A petition bearing no date, but referred to the Board by the Common Council under <br />date of July 15th, was examined and referred to the Street Commissioner for inspection <br />and report, inasmuch as this petition refers to the burning of refuse and debris at <br />• j the Beck Lake Durnp, and.requests that such activity be stopped because petitioners <br />consider it to be a smoke, fire, health and property hazard. <br />Copy of report of Ralph Moorhouse of Consoer, Townsend and Associates to the <br />Fattore Company on deficiencies revealed by their inspection of South Bend Intercepting <br />Sewer under contract No.1-C, was examined by the Board and ordered filed under Fattore <br />Company check list. <br />Attention of the Board was next called to the paving of Main Street south of the <br />j City Limits, which has been authorized by the County Commissioners, and the fact this <br />will leave one block of this street unpaved. It was the consensus of opinion of the <br />1 Board that this additional block, within the City Limits, should be paved at the same <br />time and by the same contractor, to complete the thoroughfare and effect considerable <br />. savings in cost over the letting of a contract for the paving of this block separately. <br />The City Engineer was accordingly directed by the Board to contract the contractor, <br />awarded contract by the County Commissioners, and place order with him for this <br />additional block of street paving. <br />Also brought to the attention of the Board, was the costly upkeep of a six-foot <br />strip of berm on Main Street, from Jennings to Chippewa Street, which is continually <br />washin,g avva�yr, and the suggestion was offered that this six-foot strip on each side of <br />the pavement be paved, upon obtaining a petition to cover this needed installation <br />signed by Edwards Iron Works and the individual home -owners involved. <br />•I DEDICATI02d <br />The Plat to be known as -_Zeller t s Rum Village Heights Second Addition. <br />It is located in the Northeeast Quarter of Section Tvienty-Two (22) Township Thirty - <br />Seven (37) North, Range Two (2) East and is described as follows: Beginning at a point <br />Two Hundred Six (206) feet South of the iiortheq_st corner of said Section Twenty -Two (22) <br />thence South on the East line of said Section, One Thousand Ninety-eight and two -tenths <br />(1098.2) feet; thence .Test One hundred Eight -Seven (187) feet; thence North One Thousand <br />Ninety-eight and two tenths (1093.2) feet to the South line of Whitcomb & Kellerts Rum <br />Village Heights Addition; thence East One Hundred Eight -seven (137) feet to the place <br />of beginning. <br />I <br />• ! The Plat contains T:Tenty (20) lots, numbered from One Hundred Sixty -Two (162) to <br />One Hundred Eight -One (181) inclusive. <br />The streets and alleys are hereby dedicated to the public for public uses. <br />The building lines are as shown on the Plat. <br />In �llitness Y'Thereof, Ydhitco,-nb &Keller, Inc., has caused it corporate name to be <br />hereunto subscribed by the hand of -its President and its corporate seal to be affixed <br />and attached by the hand of its Secretary and Treasurer on this nth day of June, 1952. <br />III Michael and Anna Bokon join in this dedication being the owners of Lot 181. <br />j1 Michael and Jean Ann Dallich join in this dedication being the owners of Lot 180. <br />Attest: Hovrard .'oore <br />Secretary and Treasurer <br />Michael Bokon <br />Anna Bokon <br />1ITCOi-1B & KELLER, INC. <br />By Fred ti7. Keller, President <br />l-i chael Dallich <br />Jean Ann Dallich <br />The above dedication and Plat bearin the approval stamp and signatures of the <br />Board of Par__ Commissioners and the City Plan Commission, was examined and approved <br />by the Board. Recorl_ed in the Office of the St. Joseph County Recorder Under Book <br />No.'/ Page No. W" <br />ENGII EEER' S CERTIFICATE OF CO .'PLETIOIi - CHT PiN STREET <br />Certification of Completion was furnished b T ffi lbur H. Gartner and Associates, <br />accompanied by Contractor's Completion Affidavit of the contract between the City <br />of South Bend, Owner, and the Rieth-Riley Construction Company, Contractor, for the <br />construction of the re -surface pavement irnprovement on CHAPIN STREET. fromthe south <br />line of 7ashington Avenue to the northwesterly line of Prairie Avenue under Improvement <br />Contract Iao. 3, and has been completed in accordance 'with the plans and specifications <br />for this project, and was examined by the Board and ordered filed. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.