My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - Western Avenue Corridor Improvements Project No 115-097 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 2 - Western Avenue Corridor Improvements Project No 115-097 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:42 PM
Creation date
10/13/2017 9:03:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 02 <br />Western Avenue Corridor Improvements <br />Project No. 115-097 <br />e. Water services 2" and larger shall be ductile iron, Class 50, 150 psi working pressure and in <br />accordance with AWWA C-151-91. Ductile iron pipe and valves shall be in accordance with <br />the project specifications. The water service shall include the ductile iron pipe, tapping <br />sleeve and valve, connection to existing service, and all mechanical joint fittings. <br />Add Section B.7: <br />B. Additions <br />7. In the event that fiberoptic conduit crosses the proposed foundation location, the Contractor <br />shall modify reinforcement and formwork to allow for the conduit to pass through the foundation <br />and shall be paid for Lighting Foundation Extra at the unit prices as set forth in the proposal. <br />LXXIII. DRILLED SHAFT FOUNDATION TYPEI4A <br />Revise Section BA: <br />B. Additions <br />1. Drilled shaft foundation shall be installed as noted on the plans and in accordance with INDOT <br />Standard Drawing E805-TSCS-re-15. <br />LXXXX. FLOWABLE BACKFILL. NON -REMOVABLE <br />Add: <br />A. Prevailing Specifications: <br />2016, INDOT Standard Specifications Section 213 <br />B. Additions: <br />Flowable backfrll shall be utilized where indicated on the plans. Flowable backfill will be <br />measured and paid for as FLOWABLE BACKFILL, NON -REMOVABLE (CYS). <br />LXXXXI. CENTER LINE EXPOSURE <br />Add: <br />A. Prevailing Specifications: <br />2016, iNDOT Standard Specifications Section 202 and 213 <br />B. Additions: <br />1. Voids in the subgrade are suspected beneath the pavement from Kaley Street to Meade Street <br />over the length of the existing sanitary sewer. <br />2. Contractor shall saw cut the existing pavement to remove two feet of existing pavement over <br />the existing sewer. The existing asphalt and concrete pavement shall be removed from the <br />site and properly disposed of. <br />3. The existing subgrade shall be inspected to determine the location and extent of the potential <br />voids. <br />4. Contractor shall place Flowable fill in the exposed trench to fill the voids and the excavated <br />trench to a level necessary to obtain a minimum of 2" of HMA Wedge and Level for the bond <br />breaker course for the proposed grade. <br />SHEET 4 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.