My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - Western Avenue Corridor Improvements Project No 115-097 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 2 - Western Avenue Corridor Improvements Project No 115-097 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:42 PM
Creation date
10/13/2017 9:03:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 02 <br />Western Avenue Corridor Improvements <br />Project No. 115-097 <br />5. The approximately 6" above the flowable fill shall be filled with covered or filled with temporary <br />asphalt, or other acceptable material, which will be removed during surface preparation for <br />placement of bond breaker beneath the proposed concrete overlay. <br />6. Contractor is responsible to maintain the approximately 6" depth temporary material at <br />intersections to maintain traffic. <br />7. The flowable fill shall be in accordance with specifications in this addendum. <br />8. The saw cut and excavation of concrete and asphalt pavements shall be measured by the <br />square yard and paid for as CENTER LINE EXPOSURE (SYS). <br />CONSTRUCTION CHANGES <br />DRAWINGS: <br />Plan sheets have been revised and are issued as new sheets and attached to this Change Order. Below is <br />an abbreviated summary of the revisions, see plan sheets for detailed revisions: <br />Sheet 16 of 64: Add approximately 5 syd of asphalt removal near Sta. 60+75, Lt <br />Sheet 17 of 64: Revise approach width at Sta. 69+30, Rt <br />Sheet 18 of 64. Revise approaches at Sta. 71+75, Rt. and Sta. 72+11, Lt <br />Sheet 34 of 64: Add landscaping near Sta. 60+70, Lt; Remove shrubs near Sta. 69+50, Rt <br />Sheet 35 of 64: Revise fencing, landscaping, and trees near Sta. 71+75 Rt and Sta. 71+75 Lt <br />Sheet 37 of 64: Revised landscaping near Sta. 60+70, Lt <br />Sheet 38 of 64: Revise fencing details near Sta. 71+75 Lt <br />Sheet 39 of 64: Add Decorative Fence specification for Type 4 fence <br />Sheet 46 of 64: Revise light pole location of lights 20 through 23 <br />Sheet 51 of 64: Revise aggregate section beneath pavers <br />Sheet 55 of 64: Revise approach information to reflect plan changes <br />Sheet 56 of 64: Revise Str. 32 location and Str. 32 and 33 pipe lengths <br />END CHANGE ORDER 2 <br />SHEET 5 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.