My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - Western Avenue Corridor Improvements Project No 115-097 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 2 - Western Avenue Corridor Improvements Project No 115-097 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:42 PM
Creation date
10/13/2017 9:03:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 02 <br />Western Avenue Corridor Improvements <br />Project No. 115-097 <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />Bid/Proposal Form: <br />Change the following fine items: <br />31. <br />Coarse Aggregate, No. 8 <br />99B <br />770 <br />CYD <br />$41.55 <br />$33,240.00 <br />$31, 993.50 <br />39. <br />PCCP, 10" <br />39 <br />1835 <br />SYD <br />82.75 <br />t13n�w <br />$151, 846.25 <br />41. <br />Sidewalk, Concrete, 4" <br />2860 <br />2906.1 <br />SYD <br />$42.05 <br />$12n-z=o 263.00 <br />$122,201.50 <br />69. <br />Decorative Picket Fence, 6' <br />50 <br />0 <br />LFT <br />$150.00 <br />$7;599:90 <br />$0.00 <br />72. <br />Decorative Picket Fence, Gate, 6-8' Height <br />1 <br />EACH <br />$4,700.00 <br />$4,700.00 <br />122. <br />Drilled Shaft Foundation Type -9A <br />1 <br />EACH <br />$6,800 <br />$6,800 <br />144. <br />PCCP, 4" Overlay <br />4300 <br />4045 <br />SYD <br />28.40 <br />$'"'., "' "' 0 <br />� <br />$114,878.00 <br />Add the following line items: <br />146. <br />Center Line Exposure <br />376 <br />LFT <br />$49.00 <br />$18,424.00 <br />147. <br />Flowable Backfill, Non -Removable <br />64 <br />CYD <br />$145.00 <br />$9,280.00 <br />148. <br />Light Foundation Extra <br />3 <br />EACH <br />$595.00 <br />$1,785.00 <br />149. <br />Water Services, 3" & 8" <br />1 <br />EACH <br />$8,865.00 <br />$8,865,00 <br />150. <br />Decorative Picket Fence, Type 4 <br />51.5 <br />LFT <br />$221.95 <br />$11430.43 <br />151. <br />No. 11 Aggregate, Limestone <br />1,070 <br />SYD <br />$14.45 <br />$15,461.50 <br />152. <br />Underground Storage Tank Remediation <br />1 <br />EACH <br />$8,317.00 <br />$8,317.00 <br />153. <br />Raise Fiber Optic Ducts <br />1 <br />LS <br />$3,915.00 <br />$3,915.00 <br />154. <br />Drilled Shaft Foundation Type B Anchor <br />Bolts, Not Installed <br />1 <br />LS <br />$1,005.00 <br />$1,005.00 <br />SPECIFICATIONS: <br />The following special provisions have been amended or added to the Contract Documents and are issued <br />as part of this Change Order: <br />XIII. PROSECUTION AND PROGRESS <br />Revise Section 13.1: <br />1. The project will have a final completions date of QGtGber 25, 2November 10 2017 for all <br />work. The contract time will start when the Notice to Proceed is delivered and signed. <br />SHEET 2 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.