Change Order No. 2 - Western Avenue Corridor Improvements Project No 115-097 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 2 - Western Avenue Corridor Improvements Project No 115-097 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:42 PM
Creation date
10/13/2017 9:03:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 02 <br />Western Avenue Corridor Improvements <br />Project No. 115-097 <br />OWNER: City of South Bend <br />ENGINEER: Abonmarche Consultants, Inc. <br />Chad A. Knip, P.E. <br />Indiana Professional Engineer No. 10300102 <br />CONTRACTOR: Selge Construction <br />PROJECT: Western Avenue Corridor Improvements <br />Project No. 11S-097 <br />SUBJECT: Change Order 2 <br />ISSUE DATE: October 10, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be <br />incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />Phase III: South Side Improvements — july 31, T September 15, 2017 <br />Phase IV: North Side Improvements — September 15 2017 OGt ti, r 40L, 2 October 26, 2017 <br />Phase V: Fixtures, Trees, Fencing, and Landscaping — OGtGbGF 13, 2 October 31, 2017 <br />The completion dates were extended because: <br />1) The contractor is adding another layer to the Pave Drain under bed (Add 4 days: 2 South Side, 2 <br />North Side). <br />2) The pavement section at the intersection of Olive & Western on the south side was adjusted (0.5 <br />days) <br />3) The contractor extended a larger water service than what was called for in the plans (add 1 day) <br />4) The contractor encountered fiber optic ducts in the way of the storm sewer and needed to raise <br />the fiber optic ducts and existing manhole. (add 1 day) <br />5) The contractor encountered fiber optic under the light foundations and required extra time to <br />install reinforcement around the conduit. (add 2 days) <br />6) The contractor performed additional work to address voids under the pavement (add 2.5 days) <br />7) Additional walk on South Side of Kaley Street (add 1 day) <br />The overall final completion date was changed to November 10, 2017, <br />Total Change Order Request: $85,534.18 <br />SHEET 1 OF 4 <br />