Laserfiche WebLink
REGULAR MEETING SEPTEMBER 12, 2017 282 <br />Kerr recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, TGB Unlimited d/b/a S/T Bancroft Electric, 25020 State Road 23, South Bend, Indiana, in <br />the amount of $47,990 for the base quote only. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. Fritzberg <br />seconded the motion, which carried. <br />AWARD QUOTATION — 2017 LAMPPOST PROGRAM — PROJECT NO. 117-011 A (COIT) <br />Ms. Kara Boyles, Engineering, advised the Board that on August 22, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Boyles recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Martell Electric, LLC, 4601 Cleveland Road, South Bend, IN 46628, in the amount of <br />$30,725. Therefore, Ms. Maradik made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD QUOTATION — 2017 TREE PLANTINGS — PROJECT NO. 117-009B (MVH) <br />Ms. Kara Boyles, Engineering, advised the Board that on August 22, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Boyles recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Fuerbringer Landscaping & Design, Inc., 22530 Brick Rd., South Bend, IN 46628, in the <br />amount of $19.000. Therefore, Ms. Maradik made a motion that the recommendation be accepted <br />and the quotation be awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD PROPOSAL — MORRIS PERFORMING ARTS CENTER MARQUEE UPGRADE <br />(MORRIS CAPITAL FUND) <br />Ms. Tara Weigand, Engineering, advised the Board that on August 22, 2017, proposals were <br />received and opened for the above referenced project. After review and scoring tabulation by the <br />review committee, the committee recommended that the Board award the contract to the highest <br />scoring proposal, Landmark Sign Group, 7424 Industrial Avenue, Chesterton IN 46304. Therefore, <br />Ms. Maradik made a motion that the recommendation be accepted and the proposal be awarded as <br />outlined above and the review committee be authorized to negotiate the contract documents. Ms. <br />Fritzberg seconded the motion, which carried. <br />AWARD PROPOSAL — SOUTH BEND POLICE DEPARTMENT BODY CAMERA/IN-CAR <br />VIDEO CAMERAS (POLICE GENERAL FUND) <br />Captain Chris Voros, Police Department, advised the Board that on September 7, 2017, proposals <br />were received and opened for the above referenced project. After review and scoring of the <br />proposals by a review committee made up of representatives of the South Bend Police Department, <br />Purchasing, and Information Technologies, the committee recommended that the Board authorize <br />them to negotiate a contract with the highest scoring company, Utility Associates, Inc., 250 E. <br />Ponce de Leon Avenue, Decatur, GA 30030, for the award of the proposal. Therefore, Ms. <br />Maradik made a motion that the recommendation be accepted and the committee be authorized to <br />negotiate a contract as outlined above. Ms. Fritzberg seconded the motion, which carried. Mr. <br />Michael Schmidt, Purchasing, added that in the case that the parties cannot come to terms on a <br />contract, the process will go to the next highest scoring company. He noted once a contract is <br />negotiated, it will be brought back to the board for approval. <br />APPROVE CHANGE ORDER NO. 15 — SOUTH BEND ONE-WAY TO TWO-WAY <br />CONVERSION, DIVISION B — PROJECT NO 116-001 (2015 TIF BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 15 on behalf <br />of Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, indicating the <br />contract amount be increased by $40,000 for a new contract sum, including this Change Order, in <br />the amount of $17,729,582.55. Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg <br />and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1— 2016 BUS SHELTERS — PROJECT NO 116-046 (COIT) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Gibson Lewis, LLC, 1001 West I Vh Street, Mishawaka, IN 46545, indicating the contract <br />amount be increased by $6,279 for a modified contract sum, including this Change Order, in the <br />amount of $151,241.40. Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and <br />carried, the Change Order was approved. <br />