My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - Calvert Street Lift Station Replacement - HRP Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 2 - Calvert Street Lift Station Replacement - HRP Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:29 PM
Creation date
8/23/2017 12:56:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ExCAVA rr1 <br />E ' <br />.. <br />o, <br />REQUE! <br />IRP <br />3T FOR CHANGE ORD <br />1 <br />Il <br />f <br />i <br />TO: City of South Bend 1 <br />Attn: Jacob Klosinski <br />3113 Riverside Drive <br />South Bend, IN 466281 <br />PROJECT: Calvert Street Lift Statlon: OWNER: <br />t <br />HRP Project: 1483 i <br />ROE: Structure 4 piping j ENGINEER* <br />Description of Request: Credit for notlir'stalling a portion of the piping <br />Basis of Proposal: Piping would Ibe; Into the existing flow chanty <br />credit. I <br />Ns <br />DATE: August 2, 2017 <br />RFCO #: 5 Rev. 2 <br />City of South Bend <br />DLZ <br />1 inside structure 4. <br />.I. Owner modified plumbing and asked for <br />Deduct: <br />1 <br />I <br />QTY <br />U.O.M. <br />Description I <br />Cost Each <br />Extended Cost <br />1 <br />EA <br />8" x 2' Fig X PE <br />; $ 330.00 <br />$ 330.Q0 <br />1 <br />EA <br />8" Flanged 90 1 $ 618,00 <br />$ 618.E30 <br />1 <br />EA <br />8" Mind Flange i 351.00 <br />$ 351,00 <br />1 <br />EA <br />8" Flanged Tee $ 1,067.00 <br />$ 1,067. <br />i <br />0 <br />4 <br />EA <br />8" Flange Pack I $ 33.00 <br />$ 132.i <br />0 <br />2 <br />EA <br />8" Pipe Anchor ; $ 195'00 <br />!E <br />$ 390:Q0 <br />II <br />2 <br />HR <br />2-Man Sewer Crew: <br />w/ Equipment <br />$ 126.00 <br />$ 252.10 <br />I <br />i <br />I <br />$ 3,140.gO <br />* 401 lined <br />pipe & fittings <br />Net Credit wl HRP mark-up i <br />$ . 3,454.10 <br />Joe(�Iggars "- <br />HRP Qdnstruction Inc. <br />21-4-1_? <br />Date <br />Shipping: <br />Mailing: <br />5777 Cleveland Road ' South Bend, IN <br />P.O. Box 266 South Bend, IN <br />3 <br />$ Phone 574-271-7800 <br />6 FAX 574-271-0524 <br />
The URL can be used to link to this page
Your browser does not support the video tag.