Laserfiche WebLink
HRP <br />CONSTRUCTION1 <br />r <br />EXCAVATING•SEWERS•WATERMAINS <br />"CW0%k&29 90 BE Of e gwicz If <br />REQUEST FOR CHANGE ORDER <br />r <br />DATE: July 25, 2017 <br />+ RPCO #: 4 Rev. 1 <br />TO: City of -South Bend <br />Attn: Jacob Klosinski <br />3113 Riverside Drive <br />South Bend, IN 46628 ' <br />PROJECT: Calvert Street Lift Station OWNER:' City of South Bend <br />HRP Project: 1483 <br />RE: Silt Fence Credit ENGINEER: DLZ <br />Description of Request'. - Credit for not installing slit fence on the south and east sides of the site as Indicated on <br />the erosion control plan sheet. <br />Basis of Proposal: Silt fence was not needed. Owner asked for credit. <br />Length not installed = 3B0' Cost for Installation & removal per foot = $2.50 <br />Credit with HRP mark-up = $998.00 <br />Joe Saggars <br />HRP Construction Inc. <br />-7-as—/-7 <br />Date <br />Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 <br />Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 <br />