Laserfiche WebLink
HRP <br />GUNSTRUCTION1 <br />EXCAVATING-SEWERS•WATERMAINS <br />"('W'Juz9 9, B, Cry -&-Ivtae ", <br />REQUEST FOR CHANGE ORDER <br />DATE: July 25, 2017 <br />{ R1FCO #: 6 <br />TO: City of South Bend <br />Attn: Jacob Klosinski <br />3113 Riverside Drive <br />South Bend, IN 46628 ' <br />PROJECT: Calvert Street Lift Station OWNER. City of South Bend <br />HRP Project: 1483 <br />RE: Structure #1 & ##4 vacuum test ENGINEER: DLZ <br />Description of Request: Structures ##1 & #4 are doghouse manholes. Doghouse manholes are not vacuum <br />tested. <br />Basis of Proposal: Owner asked for credit. <br />Description _,ty Unit Unit Price Extension <br />2-man sewer crew with equipment 2 HR $126.00 $252.00 <br />Testing Equipment 2 HR $28.00 $56.00 <br />Total for Change Order $308.00 <br />Jd%Sagga►s °0 <br />HRP Construction Inc. <br />%—-7 <br />Date <br />Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 <br />Mailing: P.O. Box 266 South Bend, IN 46624-0266 <br />Phone 574-271•-7800 <br />FAX 574-271-0524 <br />