My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Abonmarche Consultants Inc. - LWW and Charles Martin Intersection Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Abonmarche Consultants Inc. - LWW and Charles Martin Intersection Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:18:56 AM
Creation date
7/27/2017 8:22:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />a. Public Meetings: Attend as technical support and provide presentation materials <br />for three public meetings to gather information from the public, to present project <br />to public and for a construction open house. <br />b. Design Review Meetings: Meet with City staff to review plans, bid documents and <br />schedule. <br />6. Furnish 3 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 120 calendar days of authorization to proceed with this phase, <br />and review them with Owner. Within 10 calendar days of receipt, Owner shall submit to <br />Engineer any comments regarding the Preliminary Design Phase documents and any other <br />deliverables. <br />7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner's comments, as appropriate, and furnish to Owner 3 copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within 60 calendar days after receipt of Owner's comments. <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner -directed modifications or changes in the scope, extent, <br />character, or design requirements of or for the Project, and upon written authorization from Owner, <br />Engineer shall: <br />1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />2. Provide technical criteria, written descriptions, and design data for Owner's use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />3. Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />__.. Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.