4. Perform or provide the following additional Final Design Phase tasks or deliverables: <br />a. Traffic Signal: Design a new traffic signal at the intersection to replace the <br />existing signal and equipment. The signal will be connected to the fire station to <br />improve access and mobility of responders on a call. Perform peak hour counts <br />for signal timing. <br />b. Prepare deed of dedication document to record right of new right of way along <br />Leland Avenue. <br />c. Perform a Boundary Survey and Prepare a plat to combine all City owned lots on <br />the north and west side of Leland Avenue including any excess right of way. <br />S. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. Within 10 days of <br />receipt, Owner shall submit to Engineer any comments and, subject to the provisions of <br />Paragraph 6.01.G, instructions for revisions. <br />6. Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit 3 final copies of the bidding documents, a revised <br />opinion of probable Construction Cost, and any other deliverables to Owner within 21 <br />calendar days after receipt of Owner's comments and instructions. <br />B, Engineer's services under the Final Design Phase will be considered complete on the date when <br />the submittals required by Paragraph A1.03.A.6 have been delivered to Owner. <br />C. In the event that the Work designed or specified by Engineer is to be performed or furnished under <br />more than one prime contract, or if Engineer's services are to be separately sequenced with the <br />work of one or more prime Contractors (such as in the case of fast -tracking), Owner and Engineer <br />shall, prior to commencement of the Final Design Phase, develop a schedule for performance of <br />Engineer's services during the Final Design, Bidding or Negotiating, Construction, and Post - <br />Construction Phases in order to sequence and coordinate properly such services as are applicable <br />to the work under such separate prime contracts. This schedule is to be prepared and included in <br />or become an amendment to Exhibit A whether or not the work under such contracts is to proceed <br />concurrently. <br />D. The number of prime contracts for Work designed or specified by Engineer upon which the <br />Engineer's compensation has been established under this Agreement is L If more prime contracts <br />are awarded, Engineer shall be entitled to an equitable increase in its compensation under this <br />Agreement. <br />A1.04 Bidding or Negotiating Phase <br />A. After acceptance by Owner of the bidding documents and the most recent opinion of probable <br />Construction Cost as determined in the Final Design Phase, and upon written authorization by <br />Owner to proceed, Engineer shall: <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCAC E-500 Agreement Bchveen Owner and Engineer for Professional Services <br />Copyright D 2008 National Society of Professional Engineers for EJCAC. All rights reserved. <br />