My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - One (1) or More New Positive Displacement Hydro-Excavating Machine with Tandem Axle Cab & Chassis Spec U - Jack Doheny Companies, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - One (1) or More New Positive Displacement Hydro-Excavating Machine with Tandem Axle Cab & Chassis Spec U - Jack Doheny Companies, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 10:00:48 AM
Creation date
7/26/2017 2:38:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
water tanks shall share no common walls with the debris <br />tanks to prevent corrosion. <br />All water cells shall be positioned at or below the frame <br />of the unit thus providing the best possible and lowest <br />available center of gravity. The water cells shall not <br />raise with the debris body when dumping. <br />The water tank shall come equipped with an anti -syphon <br />device and 25' of hydrant Ell hose and fittings, A water <br />level sight gauge shall also be provided. <br />The water tank shall come supplied with a "Y" pattern <br />stainless steel strainer to filter the water before it enters <br />the tank. <br />The water tank shall carry a 10-year warranty against <br />corrosion or cracking, <br />Vacuum <br />System shall be a positive displacement rotary lobe type <br />YES NO <br />System: <br />vacuum pump. Blower to be American made roots type <br />model 824RCS-18 HG or equal. Blower to be capable of <br />4500 Cl~M @ 18 inches of mercury. Include blower <br />manufacturer's performance chart and certification. <br />System to include vacuum relief valves for protection. <br />Blower to be protected by a centrifugal separator capable <br />of separating 50 microns. A stainless steel micro strainer <br />shall be installed between the centrifugal separator and <br />the blower. A stainless steel ball shut off to prevent <br />liquid debris carry over must be included. <br />Vacuum and water systems to be independently <br />controlled so each can be increased or decreased without <br />affecting the other. Vacuum controls to be located in the <br />cab and at the operators station. The vacuum system to <br />have its own hour meter separate from the chassis hour <br />meter, positive displacement pump to be fully warranted <br />for 2,000 hours. <br />Blower Drive: <br />Chassis driven directly through a continuous duty <br />YES NO <br />transfer case. Any bidder wishing to bid an alternatively <br />driven blower may do so with a detailed explanation of <br />the system and the benefits to be received by the City of <br />South Bend from the use of such a system. All bidders <br />must include detailed diagrams of blower drive <br />system being bid. Central Services personnel will <br />review the systems bid for reliability and ease of service. <br />The results of this review will be used as a part of the <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.