Laserfiche WebLink
EXHIBIT C-3 <br />St. Joseph County <br />2016 - OPINION OF CONSTRUCTION COST ESTIMATE <br />Economic Development District No. 2 <br />Walnut Road & US 20 Water Main Connection (So. of NSC Rail and on US 20) West <br />Sept. 21, 201 <br />1 <br />Construction Engineering <br />1 <br />LSUM <br />$16,768.80 <br />$16,768.80 <br />2 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />$83,843.98 <br />$83,843.98 <br />3 <br />r4 <br />ClearingRight of Way1 <br />LSUM <br />$33,537.59 <br />$33,537.59 <br />Dewatering <br />1 <br />LSUM <br />$193,212.00 <br />$193,212,00 <br />5 <br />HMA for Approaches, Type B <br />200 <br />TON <br />$119.15 <br />$23,829.48 <br />6 <br />Fertilizer <br />2146 <br />LBS <br />$0.43 <br />$921.41 <br />7 <br />Mulching Material <br />5.4 <br />TON <br />$431.51 <br />$2,330.14 <br />8 <br />Seed Mixture U <br />403 <br />LBS <br />$6.44 <br />$2,595,48 <br />9 <br />Field Office A <br />6 <br />MO <br />$2,093.13 <br />$12,558.78 <br />10 <br />Maintaining Traffic <br />1 <br />LSUM <br />$16,768.80 <br />$16,768.80 <br />11 <br />Pipe, Water Main, 10-inch, Ductile Iron <br />20 <br />LFT <br />$63.00 <br />$1,260.00 <br />12 <br />Pipe, Water Main, 12-inch, Ductile Iron <br />258 <br />LFT <br />$64.98 <br />$16,764.84 <br />13 <br />Pipe, Water Main, 16-inch, Ductile Iron <br />4866 <br />LFT <br />$97.46 <br />$474,240.36 <br />14 <br />Jacked Pipe, 30-inch, wl carrier pipe <br />380 <br />LFT <br />$532.00 <br />$202,160.00 <br />15 <br />Fire Hydrant Assembly <br />9 <br />EA <br />$7,406.46 <br />$66,658.14 <br />16 <br />Butterfl Valve, 16-inch <br />11 <br />EA <br />$14,490.90 <br />$159,399.90 <br />17 <br />16" x 16" x 6" Tee <br />9 <br />EA <br />$2,576.16 <br />$23,185.44 <br />18 <br />22.5° 16" Bend <br />8 <br />EA <br />$2,254.14 <br />$18,033.12 <br />19 <br />16" x 16" x 16" Tee <br />1 <br />EA <br />$3,864.24 <br />$3,864.24 <br />20 <br />16" x 12" Reducer <br />1 <br />EA <br />$1,824.78 <br />$1,824,78 <br />21 <br />45' 12" Bend <br />2 <br />EA <br />$1,395.42 <br />$2,790.84 <br />22 <br />Sign, Sheet, with Legend, 0.080" <br />12 <br />SIFT <br />$24.69 <br />$296.26 <br />23 <br />Pressure Reducing Station <br />1 <br />LSUM <br />$118,074,00 <br />$118,074.00 <br />24 <br />16" x 16" x 16" Tapping Sleeve wl Valve and B <br />3 <br />LSUM <br />$26,835.001 <br />$80,505.00 <br />25 <br />Railroad Protective Liability Insurance <br />1 <br />LSUM <br />$5,367.001 <br />$5,367.00 <br />26 <br />Water Meter Pit (Fittings Valves Etc) <br />1 <br />LSUM <br />$128,808.001 <br />$128,808.00 <br />Total = $1,689,598.37 <br />Contin enc (10%) $168,959.84 <br />Total Cost of Construction (Rounded to the nearest $1000) 1 1 $1,859,000.00 <br />