Laserfiche WebLink
EXHIBIT C-2 <br />St. Joseph County <br />2016 - OPINION OF CONSTRUCTION COST ESTIMATE <br />Economic Development District No. 2 <br />Walnut Road Sanitary Sewer Extension (From 1,900 ft. N. of Edison Rd - North to US 20) <br />Sept. 21, 2015 <br />1 <br />!Con!ruction Engineering <br />1 <br />LSUM <br />$11,225.32 <br />$11,225.32 <br />2 <br />ilization and Demobilization <br />1 <br />LSUM <br />$56,126.60 <br />$56,126.60 <br />3 <br />Clearing Right of Way <br />1 <br />LSUM <br />$22,450,64 <br />$22,450.64 <br />4 <br />Dewatering <br />1 <br />LSUM <br />$450,828.00 <br />$450,828,00 <br />5 <br />Compacted Aggregate, No. 53 <br />200 <br />TON <br />$34.99 <br />$6,998.00 <br />6 <br />Compacted Aggregate, No. 73 <br />213 <br />Ton <br />$28.98 <br />$6,172.74 <br />7 <br />Milling, Asphalt, 1 1/4" <br />3,700 <br />SY <br />$2.58 <br />$9,546.00 <br />8 <br />HMA, Surface, Type B <br />221 <br />TON <br />$90.17 <br />$19,927.57 <br />9 <br />HMA, Intermediate, Type B <br />211 <br />TON <br />$69.77 <br />$14,721.47 <br />10 <br />HMA, Base, Type B <br />422 <br />TON <br />$67.62 <br />$28,535.64 <br />11 <br />PCCP Patching Full Depth <br />43 <br />SY <br />$223.27 <br />$9,600.61 <br />12 <br />HMA for Approaches, Type B <br />200 <br />TON <br />$119.15 <br />$23,830.00 <br />13 <br />Fertilizer <br />754 <br />LBS <br />$0.43 <br />$324.22 <br />14 <br />Mulching Material <br />1.9 <br />TON <br />$431.51 <br />$819.87 <br />15 <br />Seed Mixture U <br />142 <br />LBS <br />$6.44 <br />$914.48 <br />16 <br />Field Office A <br />6 <br />MO <br />$2,093.13 <br />$12,558.78 <br />17 <br />Pipe, Sanitary Sewer, 15-inch <br />1,130 <br />LFT <br />$68.70 <br />$77,631.00 <br />18 <br />Pipe, Sanitary Sewer, 24-inch <br />1,824 <br />LFT <br />$75.14 <br />$137,055.36 <br />19 <br />15` Sanitary Sewer Plug or Cap <br />1 <br />EA <br />$359.59 <br />$359.59 <br />20 <br />Manhole, Sanitary, Standard, w/Casting, Complete <br />11 <br />EA <br />$3,649.56 <br />$40,145.16 <br />21 <br />Maintaining Traffic <br />1 <br />LSUM <br />$11,225.92 <br />$11,225.92 <br />22 <br />Jacked Pipe, 36-inch, w/ carrier pipe <br />480 <br />LFT <br />$574.27 <br />$275,649.60 <br />23 <br />Sanitary Service Lateral, 6° PVC <br />2 <br />EA <br />$635.45 <br />$1,270.90 <br />24 <br />Sign, Sheet, with Legend, 0.080" <br />12 <br />SFT <br />$24.69 <br />$296.28 <br />25 <br />Railroad Protective Liability Insurance <br />1 <br />LSUM <br />$5,367.00 <br />$5,367.00 <br />Total = <br />$1,223,580.75 <br />Contingency (10%) = <br />$122,358.07 <br />Total Cost of Construction (Rounded to the nearest $1000) <br />1 <br />1 1 <br />$1,346,000,00 <br />