Laserfiche WebLink
EXHIBIT C-4 <br />St. Joseph County <br />2016 - OPINION OF CONSTRUCTION COST ESTIMATE <br />Economic Development District No. 2 <br />US-20 Sanitary Sewer Extension (Walnut Rd. to Smilax Rd.) <br />Sept. 21, 2015 <br />e ■- � a 18 ` • <br />1 Construction Engineering 1 LSUM $17,779.44 $17,779.44 <br />2 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />$88,897.21 <br />$88,897,21 <br />3 <br />ClearingRi ht of Way <br />1 <br />LSUM <br />$35,558.88 <br />$35,558.88 <br />4 <br />Curb, Remove <br />140 <br />LFT <br />$15.03 <br />$2,103.86 <br />5 <br />Pipe, Remove <br />7308 <br />LFT <br />$7.51 <br />$54,910.85 <br />6 <br />Dewaterin <br />1 <br />LSUM <br />$590,370.00 <br />$590,370.00 <br />7 <br />Compacted Aggregate, No. 53 <br />67 <br />TON <br />$41.86 <br />$2,804.79 <br />8 <br />PCCP Patching Full Depth <br />360 <br />SY <br />$223.27 <br />$80,376.19 <br />9 <br />Combined Concrete Curb & Gutter <br />140 <br />LFT <br />$34.35 <br />$4,808.83 <br />10 <br />HMA for Approaches, Type B <br />67 <br />TON <br />$140.62 <br />$9,421.23 <br />11 <br />PCCP for Approaches, 6" <br />40 <br />SY <br />$48.30 <br />$1,932.12 <br />12 <br />Seed Mixture U <br />450 <br />LBS <br />$6.44 <br />$2,898.18 <br />13 <br />Fertilizer <br />2370 <br />LBS <br />$0.43 <br />$1,017.58 <br />14 <br />Mulching Material <br />5.92 <br />TON <br />$431.51 <br />$2,554.52 <br />15 <br />Pipe, SanitarySewer, 8-inch <br />20 <br />LFT <br />$48.30 <br />$966.06 <br />16 <br />Pipe, Sanita Sewer, 24-inch <br />2004 <br />LFT <br />$75.14 <br />$150 576.55 <br />17 <br />Pipe, Sanitary Sewer, 30-inch <br />5643 <br />LFT <br />$86.95 <br />$490,632.89 <br />18 <br />Manhole, Sanitary, Standard, w/Casting, Comple <br />7 <br />EA <br />$3,864.24 <br />$27,049.68 <br />19 <br />Manhole, Sanitar <br />y, Type B, wlCastin ,Com fete <br />15 1 <br />EA <br />$4,830.30 <br />$72,454.50 <br />20 <br />Manhole, Sanitary, Drop, w/Casting, Complete <br />1 <br />EA <br />$8,587.20 <br />$8,587.20 <br />21 <br />Maintaining Traffic <br />1 <br />LSUM <br />$17,779.4411 <br />$17,779.44 <br />22 <br />Jacked Pipe, 36-inch, w/ carrier pipe <br />296 <br />LFT <br />$622.0011 <br />$184,112.00 <br />23 <br />Jacked Pipe, 42-inch, w/ carrier pipe <br />110 <br />LFT <br />$757.0011 <br />$83,270.00 <br />24 <br />Sanitary Service Lateral, 6" PVC <br />7 <br />EA <br />$858.72 <br />$6,011.04 <br />25 <br />Connection to Existing Structure <br />1 <br />EA <br />$1,073.40 <br />$1,073.40 <br />Total = <br />$1,937,946.47 <br />Contingency (10%)= <br />$193,794.65 <br />Total Cost of Construction (Rounded to the nearest $1000) <br />1 <br />$2,132,000.00 <br />