My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Jones Petrie Rafinski - Design of Leighton Plaza and Field Surveys
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Jones Petrie Rafinski - Design of Leighton Plaza and Field Surveys
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:41:41 AM
Creation date
4/13/2017 9:44:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. 90% Submittal — Phase One Final Construction Documents <br />After acceptance by Owner of the 60% Submittal documents, revised opinion of probable <br />Construction Cost, and any other deliverables subject to any Owner -directed modifications or <br />changes in the scope, extent, character, or design requirements of or for the Project, and upon <br />written authorization from Owner, the Engineer shall: <br />1. The Engineer team will meet to review the plan documents and to continue the coordination <br />efforts to ensure that the necessary elements of the plan development are on track and on <br />schedule. <br />2. Maintenance of Traffic Plan: a Maintenance of Traffic plan will be prepared specifically for <br />the identified Division phases. <br />3. Based on the data collected including comments from the City review, the Engineer will <br />move into the development of the 90% Submittal package. Further refinement to the design <br />based on input collected. <br />4. Progress Meeting 95: The Engineer will coordinate and facilitate a progress meeting to <br />review with the City of South Bend Staff the plans and to ensure that project is coordinated <br />with the various departments and that the project is on schedule. <br />5. Based on the input from Progress Meeting #5, the team will continue to develop the 90% <br />submittal plans and will begin to develop construction specifications. <br />6. The Engineer will further define the Preliminary Cost Estimate based on the refinements to <br />the plans. <br />7. Progress Meeting #6: Upon refinement of the 90% Submittal package and refinement of <br />the Preliminary Cost Estimate, The Engineer will conduct Progress Meeting #6 with the <br />City of South Bend Staff to present the plans, preliminary estimates, special provisions and <br />bid tabs. This meeting will also include the various stakeholders to review the overall layout <br />and connections to their properties. <br />8. The Team will further refine the 90% plans based on the input collected from the Progress <br />Meeting #6 and will submit the required plans and documentations for to the Owner for <br />review. <br />9. Stakeholder Meeting: The Engineer will assist the City of South Bend staff in conducting a <br />meeting with the stakeholders and affected business related to the identified Phase One <br />project limits. Comments and input collected during this meeting will be incorparted into <br />the final stages of the Construction Documents development. <br />10. Deliverables for the 90% submittal to the Owner will be provided in PDF format. <br />A. 100% Submittal —Final Construction Documents <br />After acceptance by Owner of the Phase One 90% Submittal documents, revised opinion of <br />probable Construction Cost, and any other deliverables subject to any Owner -directed <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Copyright CO 2005 National Society of Professional Engineers for EJCDC. All rights reserved. <br />