My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Jones Petrie Rafinski - Design of Leighton Plaza and Field Surveys
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Jones Petrie Rafinski - Design of Leighton Plaza and Field Surveys
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:41:41 AM
Creation date
4/13/2017 9:44:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
project approach and design. Comments received will be incorporated into the plans and <br />phasing options. <br />13. Deliverables for the 30% submittal to the Owner will be provided in PDF format. <br />D. 60% Submittal - Design. Development Phase <br />After acceptance by Owner of the 30% Submittal (Schematic Design) documents, revised opinion <br />of probable Construction Cost, and any other deliverables subject to any Owner -directed <br />modifications or changes in the scope, extent, character, or design requirements of or for the <br />Project, and upon written authorization from Owner, the Engineer shall: <br />1. Based on the data collected, the team will move into the development of the 60% Submittal <br />package. This will include, but not be limited to, further definition of the roadway <br />improvments, pedestrian walkways, street lighting, grading, utility connections, site <br />amenities, landscaping. <br />2. The Engineer's team will meet to review the plan documents and to continue the <br />coordination efforts to ensure that the necessary elements of the plan development are on <br />track and on schedule. <br />3. Preliminary Maintenance of Traffic Plan: The Engineer will continue to define the <br />Maintenance of Traffic Plan based on meetings with the City. <br />4. Progress Meeting #3: The Engineer will coordinate and facilitate a progress meeting to <br />review with the City of South staff the plans and to ensure that project is coordinated with <br />the various departments and that the project is on schedule. <br />5. Based on the input from Progress Meeting #3, the team will continue to develop the 60% <br />submittal plans and will begin to develop construction specifications. <br />6. The Engineer will revise the Preliminary Opinion of Probable Cost based on the <br />refinements to the plans. <br />7. Progress Meeting #4: Upon refinement of the 60% Design package and refinement of the <br />Preliminary Opinion of Probable cost, the Engineer will conduct Progress Meeting #4 with <br />the City of South Bend staff to present the plans and preliminary estimates. <br />8. The Engineer will further refine the 60% plans based on the input collected from the <br />Progress Meeting #4, and will submit the required plans and documentations to the City for <br />review. <br />9. As the project construction limits are greater than one (1) acre, the project will subject to the <br />City of South Bend's Pre and Post Construction Stormwater Management Plan and Rule 5 <br />or Erosion Control Plan. The Engineer will prepare the required plans and documents and <br />submit them accordingly. <br />10. Deliverables for the 60% submittal to the Owner will be provided in PDF format. <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCaC E-500 Agreement Between Owner and Engineer For Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.