My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Supplemental Agreement No. 1 - United Consulting - Addit. Scope for Coal Line Trail Phases I and II
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Supplemental Agreement No. 1 - United Consulting - Addit. Scope for Coal Line Trail Phases I and II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:15:01 AM
Creation date
3/16/2017 9:16:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fulfill the requirements of Stage 3 Plans and Final Contract Documents. <br />1. The CONSULTANT shall prepare and submit Stage-2 level plans to the LPA for <br />review and acceptance. <br />2. The CONSULTANT shall prepare and submit Stage-3 level plans to the LPA and <br />INDOT for review and acceptance. <br />3. The CONSULTANT shall prepare and submit Final Tracing plans to INDOT and the <br />LPA. <br />R. TITLE SEARCH <br />The CONSULTANT shall perform Title Searches for acquisition parcels in accordance with the <br />INDOT Right -of -Way Engineering Procedures Manual along with any supplemental <br />memoranda to said Manual and Title 865 of the Indiana Administrative Code, Articles 1 <br />through 12. The procedures for the Title Searches for 22 parcels consists of the following: <br />1. Review and interpretation of Title and Encumbrance Reports. <br />2. Determination of the owners and property limits of the areas of acquisition within the <br />project limits. <br />S. RIGHT-OF-WAY ENGINEERING <br />The CONSULTANT shall perform Right -of -Way Engineering for acquisition parcels in <br />accordance with the INDOT Right -of -Way Engineering Procedures Manual along with any <br />supplemental memoranda to said Manual and Title 865 of the Indiana Administrative Code, <br />Articles 1 through 12. The procedures for the Right -of -Way Engineering for 22 parcels <br />consists of the following: <br />1. Provide legal descriptions (certified by a registered land surveyor) of all temporary <br />and permanent acquisition parcels. <br />2. Provide land plats (certified by a registered land surveyor) for each permanent <br />acquisition parcel showing the owner's property, existing right of way and proposed <br />right of way. <br />3. Provide area computations and L-10 forms of the owners' title areas, existing rights <br />of way, proposed rights of way and residues of the owners' properties. <br />4. Provide documentation and proof and any existing rights of way. <br />5. Be available for assistance in interpreting any right of way documents with the client <br />or acquisition team. <br />T. RIGHT-OF-WAY STAKING <br />The CONSULTANT shall perform Right -of -Way Staking for acquisition parcels in accordance <br />with the INDOT Right -of -Way Engineering Procedures Manual along with any supplemental <br />memoranda to said Manual and Title 865 of the Indiana Administrative Code, Articles 1 <br />through 12. The procedures for the Right -of -Way Staking of up to 22 parcels consists of the <br />following: <br />1. Provide in the field, stake -out locating the proposed right-of-way line at property line <br />intersections, deflection points and at one hundred foot intervals. <br />2. Provide the stake -out with wood hubs and lathes. <br />a <br />Supplemental Agreernent version 6-2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.