Professional Services Supplemental Agreement No. 1 - United Consulting - Addit. Scope for Coal Line Trail Phases I and II
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Supplemental Agreement No. 1 - United Consulting - Addit. Scope for Coal Line Trail Phases I and II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:15:01 AM
Creation date
3/16/2017 9:16:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
II, Appendix "B"is amended to read as follows: <br />13. Condemnation of any parcels. <br />111. Appendix "C"is amended to read as follows: <br />L. LANDSCAPE ARCHITECTURE DESIGN AND PLANS <br />1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field Check <br />Plans. <br />2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by LPA. <br />3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by <br />INDOT and LPA and at least 30 calendar days prior to Ready for Contracts. <br />N. LIGHTING DESIGN AND PLANS <br />1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field <br />Check Plans. <br />2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by <br />LPA. <br />3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by <br />INDOT and LPA and at least 30 calendar days prior to Ready for Contracts. <br />P. ASBESTOS INSPECTION <br />1. Asbestos Inspection and Report completed prior to Stage 3 submission. <br />Q. RETAINING WALL DESIGN AND PLANS <br />1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field Check <br />Plans. <br />2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by LPA. <br />3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by <br />INDOT and LPA and at least 30 calendar days prior to Ready for Contracts. <br />R. TITLE SEARCH <br />1. Title Searches within 30 calendar days after receipt of approved Stage 2 Plans. <br />S. RIGHT-OF-WAY ENGINEERING <br />1. Plats and Legal Descriptions within 63 calendar days after receipt of Title Searches. <br />T. RIGHT-OF-WAY STAKING <br />1. Right -of -Way Staking within 14 calendar days after a request from the LPA. <br />Supplemental Agreement version 6-2011 <br />