II, Appendix "B"is amended to read as follows: <br />13. Condemnation of any parcels. <br />111. Appendix "C"is amended to read as follows: <br />L. LANDSCAPE ARCHITECTURE DESIGN AND PLANS <br />1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field Check <br />Plans. <br />2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by LPA. <br />3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by <br />INDOT and LPA and at least 30 calendar days prior to Ready for Contracts. <br />N. LIGHTING DESIGN AND PLANS <br />1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field <br />Check Plans. <br />2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by <br />LPA. <br />3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by <br />INDOT and LPA and at least 30 calendar days prior to Ready for Contracts. <br />P. ASBESTOS INSPECTION <br />1. Asbestos Inspection and Report completed prior to Stage 3 submission. <br />Q. RETAINING WALL DESIGN AND PLANS <br />1. Stage 2 Plans within 45 calendar days after the completion of the Preliminary Field Check <br />Plans. <br />2. Stage 3 Plans within 90 calendar days following receipt of Stage 2 Plans approval by LPA. <br />3. Final Tracings within 45 calendar days following receipt of Stage 3 Plans approval by <br />INDOT and LPA and at least 30 calendar days prior to Ready for Contracts. <br />R. TITLE SEARCH <br />1. Title Searches within 30 calendar days after receipt of approved Stage 2 Plans. <br />S. RIGHT-OF-WAY ENGINEERING <br />1. Plats and Legal Descriptions within 63 calendar days after receipt of Title Searches. <br />T. RIGHT-OF-WAY STAKING <br />1. Right -of -Way Staking within 14 calendar days after a request from the LPA. <br />Supplemental Agreement version 6-2011 <br />