My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Supplemental Agreement No. 1 - United Consulting - Addit. Scope for Coal Line Trail Phases I and II
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Supplemental Agreement No. 1 - United Consulting - Addit. Scope for Coal Line Trail Phases I and II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:15:01 AM
Creation date
3/16/2017 9:16:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
documents in effect at the time the plans or reports are submitted: Indiana Design Manual, <br />American Association of State Highway and Transportation Officials "A Policy on Geometric <br />Design of Highways and Streets", Indiana Department of Transportation's Standard <br />Specifications, Road and Bridge Memoranda except as modified by supplemental <br />specifications and special provisions, if any, and shall be completed to the point required to <br />fulfill the requirements of Stage 3 Plans and Final Contract Documents. <br />1, The CONSULTANT shall prepare and submit Stage-2 level plans to the LPA for review <br />and acceptance. <br />2. The CONSULTANT shall prepare and submit Stage-3 level plans to the LPA and INDOT <br />for review and acceptance. <br />3. The CONSULTANT shall prepare and submit Final Tracing plans to INDOT and the <br />LPA. <br />N. LIGHTING DESIGN AND PLANS <br />The CONSULTANT shall prepare plans, specifications and estimates of cost, which shall be in <br />accordance with the accepted standards for such work and in accordance with the following <br />documents in effect at the time the plans or reports are submitted: Indiana Design Manual, <br />American Association of State Highway and Transportation Officials "A Policy on Geometric <br />Design of Highways and Streets", Indiana Department of Transportation's Standard <br />Specifications, Road and Bridge Memoranda except as modified by supplemental <br />specifications and special provisions, if any, and shall be completed to the point required to <br />fulfill the requirements of Stage 3 Plans and Final Contract Documents. <br />1. The CONSULTANT shall prepare and submit Stage-2 level plans to the LPA for <br />review and acceptance. <br />2. The CONSULTANT shall prepare and submit Stage-3 level plans to the LPA and <br />INDOT for review and acceptance. <br />3. The CONSULTANT shall prepare and submit Final Tracing plans to INDOT and the <br />LPA. <br />P. ASBESTOS INSPECTION <br />The CONSULTANT shall make observations at the bridge and identify suspected asbestos - <br />containing materials (ACMs) that are encountered, obtain samples of the materials (if <br />feasible) and analyze samples for asbestos using polarized light microscopy. The results of <br />the findings shall be provided in a report including the location and approximate quantity of <br />ACMs encountered and will include a single -page summary of our findings as required by the <br />Indiana Department of Environmental Management. <br />Q. RETAINING WALL DESIGN AND PLANS <br />The CONSULTANT shall prepare plans, specifications and estimates of cost, which shall be in <br />accordance with the accepted standards for such work and in accordance with the following <br />documents in effect at the time the plans or reports are submitted: Indiana Design Manual, <br />American Association of State Highway and Transportation Officials "A Policy on Geometric <br />Design of Highways and Streets", Indiana Department of Transportation's Standard <br />Specifications, Road and Bridge Memoranda except as modified by supplemental <br />specifications and special provisions, if any, and shall be completed to the point required to <br />Supplemental Agreement version 6-2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.