My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Water Works Large Meter Testing - M.E. Simpson Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Quote Opening - Water Works Large Meter Testing - M.E. Simpson Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:02:47 PM
Creation date
3/2/2017 1:43:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IM.E. Simpson Co., Inc. I Large Water Meter Test and Repair Program Page 2 <br />I ♦ Meters will be tested across a range of flows to determine patterns of mechanical wear at <br />various flow rates. Flow rates used will be a combination of AWWA recommended flow rates <br />(per M-6 manual of the AW WA) and meter manufacturer flow rates. <br />♦ Meters will be tested and calibrated to bring them within accepted accuracy limits. <br />♦ Some meters need to be removed from their setting(s) for "offsite" testing due to existing <br />plumbing configurations. Efforts will be made to keep the service disruption to a minimum. <br />♦ If a water service loss for any period of time is intolerable to the water customer, <br />I recommendations will be made to the Utility to include a by-pass around the meter so <br />service disruption will not occur during the testing. <br />♦ The equipment used will be described in the "Equipment to be Used" section. <br />l♦ The Project Team will document all meter testing results and calibrations. Meters requiring <br />extensive calibrations (not worth time and material) or obsolete meters, will be brought to <br />I the Meter Superintendent's attention for potential meter change -out by the Utility. The cost <br />basis for recommending a meter change out(s) will be determined at the kick-off meeting <br />and agreed upon between M.E. Simpson Co. Inc. and the Utility. <br />♦ All calibrations will be attempted to be performed the same day of testing. After calibration, <br />the meter shall be tested to conform to test specifications outlined elsewhere in this <br />Specification. <br />♦ In its daily report to the Water Department Manager, the Project Team will review the <br />previous day's progress, and outline the meters to be tested that day. <br />♦ It may be necessary to conduct parts of the meter -testing program during "off hours" (i.e. <br />nights). This may be required in a building(s) that has a high daily usage, but is closed at <br />night. The Project Team will give 24-hour "notice of intent" to test meters that require after <br />hours or nighttime work. This will allow the Water Utility to plan for area access, and give <br />Police Department (and other Public Works Divisions) notification as to the planned testing <br />activity. <br />• Calibration parts used will be NSF 61 certified. (All new meter parts available now currently <br />meet this standard.) <br />♦ Care will be exercised when water is discharged during testing. Test meter water flow <br />discharge will not be allowed to cause interference with private property, pedestrian or <br />roadway traffic, and will have minimal environmental impact. <br />♦ Meters located in confined spaces shall be tested using accepted confined space entry <br />procedures. <br />♦ Any valves that fail or break during operation Ito isolate the water meter for testing) will be <br />repaired or replaced at the owner's expense. M.E. Simpson Company is not responsible for <br />possible valve failures due to pre-existing conditions during the testing procedure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.