My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Water Works Large Meter Testing - M.E. Simpson Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Quote Opening - Water Works Large Meter Testing - M.E. Simpson Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:02:47 PM
Creation date
3/2/2017 1:43:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IM.E. Simpson Co., Inc. I Large Water Meter Test and Repair Program Page 1 <br />SCOPE OF WORK <br />Large Water Meter Evaluation, Testing and Repair <br />Commercial/industrial Water Meters <br />The Field Scope of Service is understood to be the following: <br />M.E. Simpson Co., Inc. will furnish all labor, material, transportation, tools, and equipment necessary to <br />test and calibrate large meters selected by the Utility and complete the work herein specified. <br />I Teams of two (minimum) or more personnel will work on the meter testing program at all times. <br />Sensus compound meter with RP2. <br />Sensus "W" Series fire meter <br />♦ Work in an orderly and safe manner to insure no avoidable accidents occur. <br />♦ All Field Staff will wear photo ID badges that are easily seen while in the field. <br />1 ♦ Assess all meters listed in the test group. This assessment will include observing water usage <br />on site, as well as observing meter readings to determine if the meter is the correct type and <br />size for its application. <br />I♦ If meters cannot be tested in place, make recommendations to Utility to correct setting so <br />testing in place can occur. (Recommendation(s) would include submitting site sketches, <br />I drawings, etc. to Utility so improvements can be made.) <br />♦ Maintain a meter log for all meters to be assessed in the current test group, which will be <br />reviewed by the Project Team during verification of the meter data supplied by the Utility. <br />1 Corrections and/or updated records will be provided to the Utility (including periodic Utility <br />meter reports). <br />I� <br />♦ Every effort will be made to schedule water customer meter tests during normal working <br />hours. Exceptions to testing times, on a case -by -case basis, will depend on the severity of loss <br />of water service due to the testing procedure. Severe schedule conflicts may require after <br />hour or weekend testing. <br />1J <br />
The URL can be used to link to this page
Your browser does not support the video tag.