Laserfiche WebLink
Deliverable: <br />• Meeting minutes (MS Word document) <br />Task 2. Sewer System GIS Cleanup <br />The sewer GIS gravity and pressure main layers contain ahnost 17,500 pipe segments. Over 700 <br />islands of pipe exist that are not connected to each other and over 7,600 point structures are <br />disconnected from pipes. Arcadis will make edits to the GIS to eliminate as many isolated pipes and <br />manholes based on proximity of pipe endpoints and engineering judgment. Virtual pipe segments <br />may be created where evidence indicated pipes are connected but nothing is shown. Assumptions in <br />determining how pipes and manholes should connect will be in accordance with the agreements <br />made as part of Task 1. Arcadis will not be reviewing as -built drawings to determine the most <br />appropriate pipe and manhole configuration at this time. These services can be added as future <br />additional services if desired. <br />The Department will provide Arcadis with up to 7,000 reference drawings in electronic format such <br />as PDF or JPEG. Arcadis will create polygon boundaries for each drawing representing the <br />geographic extent they span. Each polygon will include typical title block attributes such as project <br />name, date, page number, page description and a hyperlink to the reference drawing itself. <br />Deliverable: <br />• Personal Geodatabase for the Sanitary, Combined and Storm Sewer networks and <br />reference drawing polygons <br />Task 3. Final Review Meeting <br />Arcadis will hold a project closeout meeting with the Sewers, Engineering and Innovation and <br />Technology Departments. A general overview of the project and goals will be introduced followed <br />by the presentation of GIS summary statistics to compare the data before and after project <br />completion. The meeting will close with a discussion on suggested next steps on progressing the <br />GIS and asset management efforts. <br />Agenda items are as follows: <br />• Project Goals <br />• Sewer GIS review <br />o Before and After <br />• Next steps with GIS and Asset Management <br />Deliverable: <br />• Meeting minutes (MS Word document) <br />Assumptions <br />The following assumptions are made in the creation of this scope of services and the estimated <br />services fee for this project. Assumptions include: <br />Exhibit A, Scope or Basic Engineering Services <br />Pace 2 <br />