My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/30/72 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1972
>
05/30/72 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:44:39 PM
Creation date
12/1/2016 12:27:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/30/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
326 <br />5/30/72 <br />RESOLUTION NO. 7 5/JO/72 <br />WHEREAS, The Board of Public Works and Safety, has found it necessary <br />in the best interest of the public safety and welfare to <br />construct certain street improvements in a new alignment for <br />Elwood Avenue from Portage Avenue to the intersections of <br />Angela Boulevard and Riverside Drive, all in the City of <br />South Bend, Indiana, and <br />WHEREAS, it is necessary to complete preliminary engineering studies, <br />surveys, and designs for said improvement so that a public <br />hearing can be held for interested citizens, and <br />WHEREAS, the improvements to the aforesaid Roads are compatible with <br />the Urvan Area Transportation Study, and <br />WHEREAS, the costs for this preliminary engineering are to be pro- <br />rated at 25% to the Cumulative Capital Improvement Fund and <br />75°10 to the Local Roads and Street Account, and <br />WHEREAS, the Board of Public Works and Safety has the authority to make <br />such improvements as provided by the General Assembly, therefore, <br />$E IT RESOLVED, That the Board of Public Works and Safety orders the <br />Department of Public Works to contract with a Professional <br />Engineering firm to prepare said preliminary studies, surveys <br />and designs and to seek appropriations for said contract and to <br />return said final preliminary engineering plans to the Board <br />of Public Works and Safety for a public hearing. <br />BOARD OF PUBLIC WORKS AND SAFETY <br />s/ James V. Barcome <br />s/ William J. Richardson <br />ATTEST: <br />sj Freda G. Noble, Clerk <br />Dated this 30th day of May, 1972 <br />RESOLUTION NO. 6 - 5/30/72 <br />WHEREAS, The Board of Public Works and Safety, has found it necessary <br />in the best interest of the public safety and welfare to con- <br />struct certain street improvements on Ireland Road from York <br />Road to Ironwood Drive and on ironwood Drive from Ireland <br />Road to Ewing Avenue, all in Centre and Penn Townships and <br />mostly within the existing Corporate Limits of the City of <br />South Bend, St. Joseph County, Indiana, and <br />WHEREAS, it is necessary to .complete preliminary engineering studies, <br />surveys, and designs for said improvement so that a public <br />hearing can be held for interested citizens, and <br />WHEREAS, the costs for this preliminary engineering are to be pro rated <br />at 25% to the Cumulative Capital Improvement Fund and 75% <br />to the Local Roads and Street Account, and <br />WHEREAS, the improvements to the aforesaid Roads are compatible with <br />the Urban Area Transportation Study, and <br />WHEREAS, the Board of Public Works and Safety has the authority to <br />make such improvements as provided by the General Assembly, <br />therefore, <br />1 <br />1 <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.