Laserfiche WebLink
6 <br />1 <br />r� <br />J <br />11/6/72 <br />2. Sever all utilities to the building in accordance with <br />each Utility's rules and regulations, to wit: <br />Northern Indiana Public Service Co. <br />Indiana & Michigan Electric Co. <br />Indiana Bell Telephone Co. <br />South Bend Water Works (Attached) <br />South Bend Sewer Dept. (Attached) <br />3. Remove all materials and all debris resulting from said <br />demolition from the basement before such opening is back - <br />filled. <br />4. Fill to grade level and grade the lot with 3 inches of <br />top soil and seed with 50% rye grass seed and 50% blue <br />grass seed. <br />5. Leave all live trees unless specifically requested to <br />remove, and protect them from further damage as the result <br />of the demolition. <br />6 No fires of any size will be permitted for the disposing <br />of materials as the result of the demolition, upon the <br />site. Only salamanders will be permitted for warmth. <br />7. All debris and residue resulting from the demolition is to <br />be hauled away and deposited in an approved landfill. <br />8. Secure authority for barricading and traffic control from <br />the Department of Public Works, Bureau of Traffic and <br />lighting in instances of demolition of structures adjacent <br />to arterial streets when traffic control measures are nec- <br />essary. <br />A. PROGRESS & COMPLETION <br />1. The Contractor shall secure a permit within three (3) cal- <br />endar days after receipt of "Notice to Proceed" from <br />Building Official. <br />2. The conditions as set forth in Section A, "General Con- <br />ditions" shall be complete and ready for final inspection <br />within thirty (30) calendar days after the issuance of <br />the permit. <br />3. Final inspection of the premises will be made upon com- <br />pletion of all work. <br />C. INSTRUCTION TO BIDDERS <br />1. All bids to demolish shall be submitted in accordance with <br />the following: <br />a. Bid to be based upon bidder retaining for his own use <br />or resale all salvable materials at the site of demo- <br />lition. <br />b. Contractor will be liable for damage resulting to side- <br />walks, curbs, alley -ways, and streets, and on any other <br />property as the result of the demolit-ton or equipment <br />used in the demolition. <br />2. The successful bidder shall submit and have on file a per- <br />formance bond as required by the Building Code in the penal <br />sum of $5,000 for the City of South Bend. <br />