Laserfiche WebLink
MPE <br />REGULAR MEETING <br />JUNE 3, 1974 <br />TRAFFIC CONTROL DEVICES APPROVED` <br />The Bureau of Traffic and Lighting requested approval of the <br />following traffic control devices: <br />A. Installation of a Stop Sign at the Broadmoor Shopping <br />Center drive intersection with Ireland Road. Upon <br />motion made, seconded and carried, the request was <br />approved. <br />B. No Parking Signs on the South Side of the 100 Block <br />West Bowman Street. Upon motion made, seconded and <br />carried, the recommendation was approved. <br />C. Installation of a Stop Sign on Hope at Victory. Upon <br />motion made, seconded and carried, the recommendation <br />was approved. <br />D. <br />Installation of a Stop Sign <br />on Woodfield Avenue at <br />Edison. Upon motion made, <br />seconded and carried, the <br />installation was approved. <br />E. <br />Installation of a Stop Sign <br />on McArthur at Woodlake. <br />Upon motion made, seconded <br />and carried, the installation <br />was approved. <br />F. <br />Installation of a Stop Sign <br />on Boynton at Woodridge. <br />Upon motion made, seconded <br />and carried, the installation <br />was approved. <br />STREET <br />LIGHT INSTALLATIONS APPROVED <br />The Bureau <br />of Traffic and Lighting recommended <br />the following <br />street <br />light installations: <br />1. <br />Install a 7,000L, My OH on <br />the existing pole on <br />Ardmore east of Sheridan. <br />Cost $3.75/mo. or $45.00/Yr. <br />2. <br />Install a 20,000L, MV, OH on <br />the existing pole on <br />Prairie, 1700 Block. Cost <br />$5.50/mo. or $66.00/Yr. <br />3. Danbury Dr. Newly opened roadway from Sheffield to <br />Cambridge. The area is an underground subdivision <br />according to the developer who requests U.G. 7,OOOL, MV <br />on 25' concrete poles. Cost -Install 4, 7,000 MV, UG <br />CP @ $6.50/mo. ea = $$26.00/mo or $312.00/Yr. <br />4. Install 2, 7,000 L, MV, OH, WP; one at the intersection <br />of Matthews & Cambridge and one on Matthews west of <br />Cambridge. Cost $3.75/mo each = $7.50/mo. or $90.00/Yr. <br />5. Install a 7,000L, MV, OH, WP on South Street east of <br />Fellows, midblock. This location was inadvertently <br />omitted in the previous relighting. Cost $3.75/mo. or <br />$45.00/yr. <br />6. Install.a 7,000L, MV, OH, WP at midblock on Humboldt <br />west -of Wilber and Muessel Park. Cost $3.75/mo. or $45.00/yr. <br />7. Install a 7,OOOL, MV, OH, WP on Marquette between Wilber <br />and Portage. Cost $3.75/mo. or $45.00/yr. <br />8. Install a 7,000L, MV, OH, WP at the near east end of <br />Club Drive. Cost $3.75/mo. or $45.00/yr. <br />9. Install four 7,000L, MV, OH, WP; three on Huron at midblocks <br />east of Olive, CArlisle and Warren and install one light <br />on midblock on Ford east of Olive. Cost $15.00/mo. or <br />$180.00/yr. <br />Upon motion made, seconded and carried, the installations were approved. <br />