My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/15/76 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1976
>
03/15/76 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:47:10 PM
Creation date
11/23/2016 10:39:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/15/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
34 <br />REGULAR 14EETING MARCII 15, 1976 <br />Street Address Deed No. <br />1219-1221 S. Lafayette 608 <br />1316 Liston Street 877 <br />1224 W. Washington 887 <br />922 E. Calvert 884 <br />2. That this resolution shall immediately upon its adoption <br />be submitted to the Common Council of the City of South <br />Bend pursuant to Section 30 A-2 of the Municipal Code of <br />the City of South Bend. <br />Adopted this 15th day of March, 1976. <br />BOARD OF PUBLIC WORKS <br />CITY OF SOUTH BEND <br />s/ Rollin E. Farrand <br />s/ Thomas J. Brunner, Jr. <br />ATTEST: <br />s/ Patricia DeClercq <br />TRAFFIC CONTROL DEVICES APPROVED <br />Ralph S. Wadzinski, Manager of the Bureau of Traffic and Lighting, <br />recommended the -following to the Board: <br />A. Removal of snow route signs , 500 block East Monroe. Upon <br />motion made by Mr. Farrand, seconded by Mr. Brunner and <br />carried, the removal was approved. <br />B. Installation of No Parking signs on the south side of Marshall <br />Street, from Varsity to Holiday, behind the Osteopathic Hospital. <br />Upon notion made by Mr. Farrand, seconded by Mr. Brunner and <br />carried, the installation was approved. <br />RIVER BE14D PLAZA APPLICATIONS APPROVED <br />Douglas Simpson, Director of River Bend Plaza, submitted an application <br />from Johnni Spagnola for a fruit and vegetable stand to be operated <br />from a trailer on River Bend Plaza, at Jefferson and the Plaza from <br />April l to November 1, 1976. Upon motion made by Mr. Farrand, seconded <br />by Mr. Brunner and carried, the application was approved, subject to <br />relocation of the trailer if the property is needed for other use by <br />the City of South Bend. <br />CONTRACTOR'S BOND RELEASED - ASHER CONSTRUCTION COMPANY <br />A request from the surety company for the release of the Contractor's <br />Bond of Asher Construction Company was submitted to the Board with <br />the recommendation of Ray S. Andrysiak, Bureau of Engineering, that <br />the bond can be released as of this date. Upon motion made by <br />Mr. Farrand, seconded by Mr. Brunner and carried, the bond was <br />released, effective March 15, 1976. <br />BOND APPROVED <br />A Contractor's Bond for Danny R. Venis and Thomas B. Newson, d/b/a <br />Sunshine Pools was submitted to the Board. The bond was in proper <br />form and was recommended favorably by Ray S. Andrysiak, Bureau of <br />Engineering. Upon motion made, seconded and carried, the bond was <br />approved to March 9, 1977. <br />
The URL can be used to link to this page
Your browser does not support the video tag.