My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/15/76 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1976
>
03/15/76 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:47:10 PM
Creation date
11/23/2016 10:39:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/15/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING MARCH 15, 197 6 <br />FORM OF CONTRACT WITH MICHIA14A MACK APPROVED <br />Deputy City Attorney William Stanley submitted to`the Board a <br />contract with Michiana Mack, Inc.•for three Fire Department <br />pumpers. Mr. Stanley recommended that the Board approve the form <br />of the contract and submit it to Michiana Mack for signature <br />today. Upon motion made by I-fr. Farrand, seconded by Mr. Brunner <br />and carried, the contract was approved and will be submitted to <br />Michiana Flack for signature. <br />CHANGE IN CONTRACT FOR PUMPERS APPROVED <br />The Board received a recommendation from Chief Snider that the <br />following changes in the Fire Department pumper bid from Michiana <br />Mack, Inc. be approved: <br />1. Make hose body portions higher and raise rear grab rail <br />a corresponding amount <br />2. Move right cab seat back so eliminating the spare <br />behind the seat, to give the rider more room. <br />3. Install two steps on rear of hose body, instead <br />of one as specified. <br />4. Bend diamond plate on top of compartments <br />900 and weld corners. <br />5. One hose roller between booster reels: $63.00 per <br />truck. <br />6. Circle D two -point compartment locks: <br />$181.00 per truck. <br />7— Diamond plate aluminum on front of hose body <br />removable for service access to pump. <br />$285.00 per truck. <br />Items 1 through 4 will be furnished at Michiana Mack's expense <br />and items 5 through 7 will be furnished at a cost per truck of <br />$529, or a total of $1587. Mr. Farrand noted that these changes <br />will still make the total cost°fall within the budgeted appropriation. <br />Upon motion made by Mr. Farrand,•secon:ded by Mr. Brunner and <br />carried, the change was approved. <br />RECOMMENDATION TO AWARD BID - AIRPORT INDUSTRIAL PARK. PHASE IV <br />The Board received a recommendation from Patrick 11. McMahon, <br />Manager of the Bureau of Public Construction, that the bids <br />for the Airport Industrial Park, Phase IV had been reviewed and <br />found to be win order. A tabulation of bids was attached. <br />Mr. 1161ahon recommended that the Board accept the low bid of <br />Ritschard Brothers, Inc. to award a contract in the amount of <br />their base bid of $1,403,666.75, conditioned upon the concurrence <br />of the Economic Development Administration. Upon motion made <br />by Mr. Farrand, seconded by Mr. Brunner and carried, the recom- <br />mendation was approved and the bid of Ritschard Brothers, Inc. <br />of $1,403,666.75 for Airport Industrial Park, Phase IV, was <br />accepted subject to the concurrence of the Economic Development <br />Administration. <br />PETITION TO VACATE PORTION OF BRYAN STREET AND THREE ALLEYS FILED <br />The South ?lend Community School Corporation, by its Attorney <br />Bruce Bancroft, files a petition to vacate a portion of Bryan Street <br />and three alleys between Beale and Roosevelt Street in the Brown <br />Middle School area. Upon motion made by Mr. Farrand, seconded by <br />Mr. Brunner and carried, the petition was filed and was referred to <br />the Bureau of Design and Administration for review and recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.