Laserfiche WebLink
Change Order No. 26 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />Remove 42 SYS from Line Item 114: SODDING, NURSERY AND TOPSOIL, -42 SYS <br />@ $4.30/SYS for a total subtraction of ($180.60). <br />Add 4 SYS to Line Item 116: BRICK, DECORATIVE, 4 SYS @ $113.00/SYS for a total <br />addition of $452.00. <br />Remove 1 EACH from Line Item 257: SIGNAL PEDESTAL FOUNDATION, A, -1 EACH <br />@ $585.00/EACH for a total subtraction of ($585.00). <br />Add 23 LFT to Line Item 261: CONDUIT, PVC, 2 IN, SCHEDULE 80, 23 LFT @ <br />$5.20/LFT for a total addition of $119.60. <br />Add 58 LFT to Line Item 263: CONDUIT, HDPE, 2 IN, SCHEDULE 80, 58 LFT @ <br />$11.30/LFT for a total addition of $655.40. <br />Add 54 LFT to Line Item 312: NO, 4 WIRE, COPPER, 4 1/C, 54 LFT @ $1.40/LFT for a <br />total addition of $75.60. <br />Add 54 LFT to Line Item 313: NO. 6 WIRE, COPPER, 4 1/C, 54 LFT @ $1.10/LFT for a <br />total addition of $59.40. <br />SPECIFICATIONS: <br />NO CHANGE REQUIRED <br />DRAWINGS: <br />Project Number 114-035: <br />SHEET 9 : Revised Sheet; Revised Detail <br />SHEETS 31, 38, 44, 94, & 95: Revised Sheets; Revised Parking Spaces, <br />Deleted Sidewalk <br />SHEET 56: Revised Sheet; Revised Pavement Markings <br />Project Number 115-019: <br />SHEETS 13, 49-A, 58, 60, 85, 116, 118, 170-A, 183, 204-A, 220: Deleted <br />Sheets <br />SHEETS 13-A, 49-B, 58-A, 60-A, 85-A, 116-A, 118-A, 170-B, 183-A, 204-B, <br />220-A: Replaced Sheets; Modified Curb Line, Curb Ramp, & Markings <br />END OF CHANGE ORDER NO. 26 <br />Sheet 3 of 4 <br />