Project No. 116-001 Change Order No. 26 - 9/30116
<br />OYyOV TO 94;1
<br />CITY OF SOUTH BEND,
<br />w a`
<br />R
<br />PROJECT NAME: One -Way to Two -Way Street Conversion -Division B 1865
<br />PROJECT NUMBER: 116-001
<br />114-035:
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />I Unit
<br />Unit Price
<br />ITotal Amount
<br />18
<br />SIDEWALK, CONCRETE, REMOVE
<br />-67
<br />SYS
<br />$4.75
<br />(-$318.25)
<br />83
<br />SIDEWALK, CONCRETE, 5"
<br />-55
<br />SYS
<br />$37.00
<br />(-$2,035.00)
<br />87
<br />CURB RAMP, CONCRETE, A
<br />7
<br />SYS
<br />1 $140.001
<br />$980.00
<br />114
<br />SODDING, NURSERY AND TOPSOIL
<br />-100
<br />SYS
<br />$4.30
<br />1 $-430.00)
<br />116
<br />BRICK, DECORATIVE
<br />88
<br />SYS
<br />$113.001
<br />$9,944.00
<br />160
<br />PIPE, TYPE 2, CIRCULAR, 12 IN
<br />10
<br />LFT
<br />$24.00
<br />$240.00
<br />527
<br />HEADER, CONCRETE
<br />20
<br />LFT
<br />$30.98
<br />$619.60
<br />115-019:
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />15
<br />CURB, CONCRETE, REMOVE
<br />-60
<br />LFT
<br />$3.40
<br />($204.00)
<br />18
<br />SIDEWALK, CONCRETE, REMOVE
<br />-88
<br />SYS
<br />$4.75
<br />($418.00)
<br />35
<br />SUBGRADE TEATMENT, TYPE IV
<br />-4
<br />SYS
<br />$31.30
<br />(-$125.20)
<br />43
<br />WIDENING WITH HMA, TYPE D
<br />-2
<br />TON
<br />$110.00
<br />(-$220.00)
<br />44
<br />MILLING, ASPHALT, 1 1/2 IN
<br />-4
<br />SYS
<br />$1.75
<br />(-$7.00)
<br />51
<br />QC/QA-HMA, 4, 76, SURFACE, 9.5 mm
<br />-1
<br />TON
<br />$77.00
<br />(-$77.00)
<br />69
<br />PCCP, 4 IN.
<br />2
<br />SYS
<br />$40.50
<br />$81.00
<br />82
<br />SIDEWALK, CONCRETE, 4"
<br />-45
<br />SYS
<br />$34.00
<br />(-1,530.00)
<br />84
<br />SIDEWALK, CONCRETE, 6"
<br />3
<br />SYS
<br />$43.00
<br />$129.00
<br />87
<br />CURB RAMP, CONCRETE, A
<br />-23
<br />SYS
<br />$140.00
<br />(-3,220.00)
<br />100
<br />CURB, CONCRETE
<br />1
<br />LFT
<br />$19.00
<br />$19.00
<br />104
<br />CURB AND GUTTER, B, CONCRETE
<br />1
<br />LFT
<br />$22.00
<br />$22.00
<br />114
<br />SODDING, NURSERY AND TOPSOIL
<br />-42
<br />SYS
<br />$4.30
<br />($-180.60)
<br />116
<br />BRICK, DECORATIVE
<br />4
<br />SYS
<br />$113.00
<br />$452.00
<br />257
<br />SIGNAL PEDESTAL FOUNDATION, A
<br />-1
<br />EA
<br />$585.00
<br />($585.00)
<br />261
<br />CONDUIT, PVC, 2 IN, SCHEDULE 80
<br />23
<br />LFT
<br />$5.20
<br />$119.60
<br />263
<br />CONDUIT, HDPE, 2 IN, SCHEDULE 80
<br />58
<br />LFT
<br />$11.30
<br />$655.40
<br />Sheet 4 of 4