My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:57:02 PM
Creation date
11/9/2016 10:14:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 26 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />SYS @ $4.30/SYS for a total subtraction of ($430.00) <br />Add 88 SYS to Line Item 116: BRICK, DECORATIVE, 88 SYS @ $113.00/SYS for a <br />total addition of $9,944.00. <br />Add 10 LFT to Line Item 160: PIPE, TYPE 2, CIRCULAR, 12 IN, 10 LFT @ <br />$24.00/LFT for a total addition of $240.00. <br />Add 20 LFT to Line Item 527: HEADER, CONCRETE, 20 LFT @ $30.98/LFT for a <br />total addition of $619.60. <br />Project 115-019: <br />Remove 60 LFT from Line Item 15: CURB, CONCRETE, REMOVE, -60 LFT @ <br />$3.40/LFT for a total subtraction of ($204.00). <br />Remove 88 SYS from Line Item 18: SIDEWALK, CONCRETE, REMOVE, -88 SYS @ <br />$4.75/SYS for a total subtraction of ($418.00). <br />Remove 4 SYS from Line Item 35: SUBGRADE TREATMENT, TYPE IV, -4 SYS @ <br />$31.30/SYS for a total subtraction of ($125.20). <br />Remove 2 TON from Line Item 43: WIDENING WITH HMA, TYPE D, -2 TON @ <br />$110.00/TON for a total subtraction of ($220.00). <br />Remove 4 SYS from Line Item 44: MILLING, ASPHALT, 1 Y IN, -4 SYS @ $1.75/SYS <br />for a total subtraction of ($7.00). <br />Remove 1 TON from Line Item 51: QC/QA-HMA, 4, 76, SURFACE, 9.5 mm, -1 TON @ <br />$77.00/TON for a total subtraction of ($77.00). <br />Add 2 SYS to Line Item 69: PCCP, 4 IN., 2 SYS @ $40.50/SYS for a total addition of <br />$81.00 <br />Remove 45 SYS to Line Item 82: SIDEWALK, CONCRETE, 4", -45 SYS @ <br />$34.00/SYS for a total subtraction of ($1,530.00). <br />Add 3 SYS to Line Item 84: SIDEWALK, CONCRETE, 6", 3 SYS @ $43.00/SYS for a <br />total addition of $129.00. <br />Remove 23 SYS to Line Item 87: CURB RAMP, CONCRETE, A, -23 SYS @ <br />$140.00/SYS for a total subtraction of ($3,220.00). <br />Add 1 LFT to Line Item 100: CURB, CONCRETE, 1 LFT @ $19.00/LFT for a total <br />addition of $19,00. <br />Add 1 LFT to Line Item 104: CURB AND GUTTER, B, CONCRETE, 1 LFT @ <br />$22.00/LFT for a total addition of $22.00. <br />Sheet 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.