Laserfiche WebLink
Change Order No. 26 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion, Division B <br />Project No. 116-001 <br />SUBJECT: Parking Revision on Michigan North of LaSalle <br />ISSUE DATE: October 3, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Revised parking along the east side of Michigan Street north of LaSalle Avenue <br />requested on Division B of Contract 116-001. Work to be performed according to <br />INDOT Standard Specifications. This results in a $4,046.55 cost increase for <br />Division B. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />1. Bid/Proposal Form: <br />Division B: <br />Project 114-035: <br />Remove 67 SYS from Line Item 18: SIDEWALK, CONCRETE, REMOVE, -67 SYS @ <br />$4.75/SYS for a total subtraction of ($318.25). <br />Remove 55 SYS from Line Item 83: SIDEWALK, CONCRETE, 5", 55 SYS @ <br />$37.00/SYS for a total subtraction of ($2,035.00). <br />Add 7 SYS to Line Item 87: CURB RAMP, CONCRETE, A, 7 SYS @ $140.00/SYS for <br />a total addition of $980.00. <br />Remove 100 SYS from Line Item 114: SODDING, NURSERY AND TOPSOIL, -100 <br />Sheet 1 of 4 <br />