Laserfiche WebLink
264 <br />REGULAR MEETING <br />APRIL 19, 1982 <br />Service did not meet specifications, and the cost to the city would <br />be considerably higher if the city would assume the loading and <br />dumping costs in addition to paying for the hauling. Following a <br />brief review of the bids, upon a motion made by Mr. Leszczynski,' <br />seconded by Mr. Kernan and carried, the low bid meeting specifica- <br />tions of Superior Waste Systems in theanount of $3.93 per cubic <br />yard was approved. <br />OPENING OF BIDS - STREEt DEPARTMENT EQUIP14ENT <br />This was the date set.for receiving and opening sealed bids for <br />the supply and mounting of five crankshaft hydraulic systems, three <br />14' x 7'.dump boxes with hoist, two 10' x 7' dump boxes with hoist <br />and miscellaneous equipment on three tandem and two single axle <br />International cab and chassis. The Clerk tendered proofs of <br />publication of notice in the South Bend Tribune and the Tri-County <br />News which were found to be sufficient. The following bids were <br />opened and publicly read <br />Stanley Enterprises, Inc. Bid was signed by Richard <br />2808 Tucker Drive Kromkowski, non -collusion <br />South Bend, Ind. was in order, and a certified <br />check in the amount of $5,835.00 <br />was submitted. <br />Three 14' x 7' Dump Body Perfection #344, hoist <br />and hydraulic system 8,11,987.00 each <br />Two 10' x 7' Dump Body Perfection #3448, hoist <br />and hydraulic system 11,197.00 each <br />Total: $58,355.00 <br />Deeds Equipment Co., Inc. Bid was signed by John K. <br />8015 East 45th Street Brennan, non -collusion affidavit <br />Lawrence, Ind. 46226 was in order, and a 10% bid bond <br />was submitted. <br />Five Muncie "Big Red" hydraulic pumps, four each <br />3-section hydraulic bank valves and one 4-section <br />hydraulic bank valve and fittings and component parts: <br />Four with 3-section valve - $1,495.00 each = $5,980.00 <br />One with 4-section valve - 1,595.00 <br />Spreader valve - $426.00 each for 5 units = 2,130.00 <br />Two 10' x 7' Dump Body Galion NEAP-6 <br />($4,264.00 each) 8,528.00 <br />Three 14' x 7' Dump Body Galion 500 <br />($5,704.00 each) 17 112.00 <br />Remounting F-5 scrapers, hose and packing <br />kit ($401.61 each per 4 units) 1,604.44 <br />Remounting F-55 scrapers, hose, packing <br />kit and reverse cylinder 503.00 each <br />Remounting of five hitches ($455.27 each) 2,276.35 <br />Freuhauf Corporation Bid was signed by Lynn Crandall, <br />137 South Olive St. non -collusion affidavit was in <br />P. 0. Box 3067 order, and a 10% bid bond was <br />South Bend, Ind. 46619 submitted. <br />Five remountings of root underbody scrapers $ 4,000.00 <br />($800.00 each) <br />Five remountings Hustings hitches ($700.00 3,500.00 <br />each) <br />