REGULAR MEETING
<br />Rose Fuel & Materials, Inc.
<br />513 E. Madison St.
<br />South Bend, Indiana
<br />No. 20, Portland Cement
<br />Medusa Aggregates Co.
<br />P. O. Box 5529
<br />Lafayette, Indiana 47903
<br />No. 13, Coarse Agg. #9
<br />No. 14, Coarse Agg. #73
<br />No. 15, Fine Agg.
<br />Hass Concrete Products
<br />24423 State Road 23
<br />South Bend, Ind.
<br />No. 17, Ready Mix Concrete,
<br />Class A Limestone
<br />No. 18, Ready Mix Concrete,
<br />Class A Slag
<br />No. 19, Ready Mix Concrete, Class B
<br />No. 20, Portland Cement
<br />Eckler-Lahey Lumber Co.
<br />1406 S. Franklin
<br />South Bend, Indiana
<br />No. 20, Portland Cement
<br />Walsh & Kelly, Inc.
<br />24358 State Road 23
<br />South Bend, Indiana 46614
<br />APRIL 5, 1982
<br />Bid was signed by R.-Boyd.Harwood,
<br />non -collusion affidavit was in
<br />order, and a certified check
<br />was submitted.
<br />$ 4.50/bag 13,500.00
<br />Bid was signed by Rex F. Kepler,
<br />non -collusion affidavit was in
<br />order, and a 10% bid bond was
<br />submitted.
<br />3.35/ton 26,000.00
<br />2.75/ton 13,750.00
<br />2.20/ton 4,400.00
<br />Bid was signed by Joseph F. Wagner,
<br />non -collusion affidavit was in
<br />order, and a 10% bid bond was
<br />submitted.
<br />48.30/CY
<br />47.60/CY
<br />43.40/CY
<br />4.44/bag
<br />28,980.00
<br />47,600.00
<br />6,495.00
<br />13,320.00
<br />Bid was signed by Peter H. Mullen,
<br />non -collusion affidavit was in
<br />order, and a 10% bid bond was
<br />submitted.
<br />4.52/bag 13,560.00
<br />Bid was signed by Thomas 0..
<br />Walsh, non -collusion affidavit
<br />was in order, and a 10% bid
<br />bond was submitted.
<br />No.
<br />1,
<br />HAC
<br />Surface #11
<br />Limestone
<br />21.25/ton
<br />,212,500.00
<br />No.
<br />2,
<br />HAC
<br />Surface #11
<br />B. F. Slag
<br />21.45/ton
<br />536,250.00
<br />No.
<br />3,
<br />HAC
<br />Surface #11
<br />B.O.F. Slag
<br />21.20/ton
<br />106,000.00
<br />No.
<br />4,
<br />HAC
<br />Binder #8 or
<br />#9
<br />16.85/ton
<br />168,500.00
<br />No.
<br />5,
<br />HAC
<br />Binder #11
<br />18.25/ton
<br />45,625.00
<br />No.
<br />6,
<br />HAC
<br />Base
<br />16.85/ton
<br />84,250.00
<br />No.
<br />7,
<br />Bit.
<br />Material,
<br />Tack
<br />175.00/ton
<br />26,250.00
<br />No.
<br />8,
<br />Bit.
<br />Material,
<br />Crack Pouring
<br />0.85/gal.
<br />17,000.00
<br />No.
<br />9,
<br />Bit.
<br />Material -
<br />Road Oil
<br />1.10/gal.
<br />192,500.00
<br />No.
<br />10,
<br />Bit.
<br />Patch Material
<br />25.50/ton
<br />25,500.00
<br />Rieth-Riley Construction
<br />P. 0. Box 1775
<br />South Bend, Indiana 46634
<br />Bid was signed by Richard D.
<br />Ruhlman, non -collusion affidavit
<br />was in order, and a 10% bid bond
<br />was submitted.
<br />No.
<br />1,
<br />HAC
<br />Surface
<br />#11 Limestone
<br />21.50/ton
<br />215,000.00
<br />No.
<br />2,
<br />HAC
<br />Surface
<br />#11 B.F. Slag
<br />21.50/ton
<br />537,,500.00
<br />No.
<br />3,
<br />HAC
<br />Surface
<br />#11 B.O.F. Slag
<br />21.50/ton
<br />107,500.00
<br />No.
<br />4,
<br />HAC
<br />Binder
<br />#8 or #9
<br />17.00/ton
<br />170,000.00
<br />No.
<br />5,
<br />HAC
<br />Binder
<br />#11
<br />18.00/ton
<br />45,000.00
<br />No.
<br />6,
<br />HAC
<br />Base
<br />15.80/ton
<br />79,000.00
<br />No.
<br />10,
<br />Bit.
<br />Patch
<br />Material
<br />25.80/ton
<br />25,800.00
<br />
|