Laserfiche WebLink
M <br />REGULAR MEETING <br />MARCH 4, 1985 <br />ST. JOSEPH MATERIALS COMPANY, INC. <br />60669 Orange Road <br />South Bend, Indiana 46614 <br />Bid was signed by Donald L. Decker, Sales Manager, Indiana <br />Division, Non -Collusion Affidavit was in order and a 10% Bid <br />Bond was submitted. <br />BID: #13 5.25/ton = $ 42,000.00_ <br />#15 4.45/ton = 22,250.00 <br />#16 3.85/ton = 7,700.00_ <br />THE LEVY COMPANY, INC. <br />P.O. Box 540 <br />Portage, Indiana 46368 <br />Bid was signed by Donald L. Decker, Sales Manager, Indiana. <br />Division, Non -Collusion Affidavit was in order and a 10% Bid <br />Bond was submitted. <br />BID: #12 <br />6.95/ton = $104,250.00 <br />#14 <br />6.95/ton = 34,750.00 <br />#17 <br />6.75/ton = 13,500.00 <br />ARCO ENGINEERING CONSTRUCTION CORPORATION <br />705 South <br />Beiger Street <br />Mishawaka, <br />Indiana 46544 <br />Bid was signed <br />by William Reiff, President and Jack <br />Riegsecker, Vice -President, Non -Collusion Affidavit was in <br />order and <br />a 10% Bid Bond was submitted. <br />BID: # 1 <br />27.00/ton = $675,000.00 <br /># 2 <br />28.95/ton = 723,750.00 <br /># 3 <br />27.00/ton = 135,000.00 <br /># 4 <br />18.95/ton = 189,500.00 <br /># 5 <br />19.00/ton = 95,000.00 <br /># 6 <br />18.00/ton = 90,000.0.0 <br />#10 <br />32.00/ton = 32,000.00 <br />KOCH ASPHALT COMPANY <br />1510 Clover Road <br />Mishawaka, Indiana 46544 <br />Bid was signed by John Baumgartner, Sales Representative, <br />Non -Collusion Affidavit was in order and a 10% Bid Bond was <br />submitted. <br />BID: <br /># 7 <br />144.00/ton <br />=$ 21,600.00 <br /># 8 <br />.68/gal <br />= 27,200.00 <br /># 9 <br />.3247/gal. <br />= 56,822.50 <br />#11 <br />.6647/gal. <br />= 398,820.00 <br />WALSH <br />& KELLY, INC. <br />24358 <br />State <br />Road 23 <br />South <br />Bend, <br />Indiana 46614 <br />Bid was signed by Thomas <br />0. Walsh, President, Non -Collusion <br />Affidavit was in order and <br />a 10% Bid Bond was submitted. <br />BID: <br /># 1 <br />23.00/ton = $575,000.00 <br /># 2 <br />24.00/ton = <br />600,000.00 <br /># 3 <br />24.50/ton = <br />122,500.00 <br /># 4 <br />18.50/ton = <br />185,000.00 <br /># 5 <br />18.00/ton = <br />90,000.00 <br /># 6 <br />18.00/ton <br />90,000.00 <br />#10 <br />27.50/ton <br />27,500.00 <br />