Laserfiche WebLink
REGULAR MEETING <br />MARCH 4, 1985 <br />HASS CONCRETE PRODUCTS COMPANY <br />24423 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by Joseph F. Wagner, General -`Manager, <br />Non -Collusion Affidavit was in order'and a 10% Bid'Bond wa`s- <br />submitted. <br />BID: #18 Class A Limestone 49.90/cy = $29,940.`06 - <br />#19 Class A Slag 48.20/cy = 48,200.00 <br />#20 44.50/cy = 611675.00 <br />#21 4.97/bag = 14,910.00 <br />KUERT CONCRETE, INC. <br />3113 L.W.W. <br />South Bend, Indiana 46628 <br />Bid was signed by A:'E.J'. McManus,President, Non -Collusion <br />Affidavit was in order and a 10% Bid Bond was submitted. <br />BID: #16 6.50/ton = $13,000.00 <br />#18 Class A Limestone 46.90/cy $28,140.00 <br />#19 Class A Slag 46.90/cy = 461900.'00 <br />#20 43.70/cy = 6,555.00 <br />ECKLER-LAHEY LUMBER COMPANY <br />1406 South Franklin at Broadway - <br />South Bend, Indiana 46617 <br />Bid was signed by Peter H. Mullen, Non -Collusion Affidavit was <br />in order and a 10% Bid Bond was submitted. <br />BID: #21 4.75/bag = $14,250.00 <br />RIETH-RILEY CONSTRUCTION COMPANY, INC. <br />P.O.Box 1775 <br />South Bend, Indiana 46634 <br />Bid was signed by Chester L. Skwarcan, Manager, Indiana <br />Division, Non -Collusion Affidavit was in order and a 10% Bid <br />Bond was submitted. <br />BID: # 1 24.00/ton = $600,000.00 <br /># <br />2 <br />24.95/ton = <br />623,750.00 <br /># <br />3 <br />24.40/ton = <br />122,000.00 <br /># <br />4 <br />18.75/ton = <br />187,500.00 <br /># <br />5 <br />18.90/ton = <br />94,500.00`= <br /># <br />6 <br />18.25/ton = <br />91,250.00 <br />#10 <br />27.35/ton = <br />27,350.00 <br />VULCAN MATERIALS COMPANY <br />24358 SR 23 <br />South Bend, Indiana 46614 <br />Bid was signed by Dave B. Roseberry, Sales Representative, <br />Non -Collusion Affidavit was in order and a Bid Bond in the <br />amount of $6,800.00 was submitted. <br />BID: *#13 3.25/ton FOB = $26,000.00 <br />*#15 3.00/ton FOB = 15,000.00 <br />*#16 2.25/ton FOB = 4,500.00 <br />*Means - ADD $1.50 per ton per unit price <br />for deliveries to either garage or jobsites. <br />