My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/11/89 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1989
>
09/11/89 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:26:48 PM
Creation date
9/28/2016 10:38:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/11/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
271 <br />REGULAR MEETING <br />SEPTEMBER 11, 1989 <br />SPECIALTY SYSTEMS OF ILLINOIS <br />16810 South Lathrop Avenue <br />Harvey, Illinois 60426 <br />Bid was signed by Joe W. Taylor, President, and Richard <br />J. Hughes, Secretary, Non -Collusion Affidavit was in order <br />and a 5% Bid Bond was submitted. <br />BID: CONTRACT <br />A-1 <br />TOTAL <br />BASE <br />BID: <br />$153,466.00 <br />CONTRACT <br />A-2 <br />TOTAL <br />BASE <br />BID: <br />$ 96,215.00 <br />SAFE ENVIRONMENT CORPORATION (SECO) <br />1116 Westgate <br />Oak Park, Illinois 60031 <br />Bid was signed by Richard Lair, President, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />BID: CONTRACT <br />A-1 <br />TOTAL <br />BASE <br />BID: <br />$143,222.00 <br />CONTRACT <br />A-2 <br />TOTAL <br />BASE <br />BID: <br />$116,250.00 <br />ASBESTOS SERVICES, INC. <br />9028 Hills Road <br />P. O. Box 141 <br />Baroda, Michigan 49101 <br />Bid was signed by J. R. Thomas, President and D. J. Eppard, <br />Secretary, Non -Collusion Affidavit was in order and a Bid <br />Bond in the amount of $21,000.00 was submitted. <br />BID: CONTRACT A-1 TOTAL BASE BID: $193,496.00 <br />CONTRACT A-2 TOTAL BASE BID: $113,000.00 <br />Upon a motion made by Mr. Leszczynski, seconded by Ms. Humphreys <br />and carried, the above bids were referred to the Division of <br />Environmental Services for review and recommendation. <br />In response to questions from the news media, Mr. Jack Dillon, <br />Director, Division of Environmental Services, explained the scope <br />of the project which entails the removal of asbestos at the <br />Wastewater Treatment Plant. <br />It was noted that asbestos at the plant does not pose any health <br />hazard at this time, but in conjunction with the renovation at <br />the plant, it was decided to handle the removal of asbestos at <br />this time. Mr. Dillon indicated that the Engineers Estimate for <br />Contract #1 is $450,000.00 and the estimate for Contract 42 is <br />$200,000.00. He further noted that Contract #1 is for removal of <br />asbestos that is in current need of removal and which could pose <br />a possible health hazard. Contract #2 is for the removal of less <br />hazardous asbestos which is still in acceptable condition. Mr. <br />Dillon noted that both contracts were included in order that the <br />City would have an option available to it regarding the removal <br />of the asbestos from the Plant. <br />Board Attorney Jenny Pitts Manier advised that all bidders will <br />be sent a letter concerning a possible patent infringement and <br />stating that they will be required to confirm to the City that <br />their bid does not contain unlicensed use of the particular removal <br />equipment and system. <br />In further response to questions from the news media, it was <br />stated that the project timetable is six (6) weeks for each <br />Contract with a total project completion timetable of twelve (12) <br />
The URL can be used to link to this page
Your browser does not support the video tag.