Laserfiche WebLink
REGULAR MEETING <br />APRIL 30, 1990 <br />APPROVE PROJECT COMPLETION AFFIDAVIT - SOUTHFIELD PHASE I <br />Mr. Ronald N. Howell, President, Small, Inc., 25190 State Road 4, <br />North Liberty, Indiana, submitted a Project Completion Affidavit <br />for Southfield Phase I. Also submitted with the Affidavit was a <br />Maintenance Bond in the amount of $31,446.96. Mr. Leszczynski <br />made a motion that the Project Completion Affidavit be approved <br />and executed. Mrs. DeClercq seconded the motion which carried. <br />AWARD BIDS - STREET MATERIALS <br />It is noted that bids for street materials were opened by the <br />Board on April 16, 1990 for the following materials: <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />18. <br />19. <br />20. <br />21. <br />22. <br />23. <br />24. <br />25. <br />HAC Surface - #11 Limestone <br />HAC Surface - 411 BF Slag <br />HAC Surface - *11 BF Slag W/Fib. <br />HAC Surface - #11 BF Slag Mod. <br />HAC Surface - #11 BF Sand Mix <br />HAC Binder - #8 or #9 <br />HAC Binder - #11 <br />HAC Base - #5D <br />Bituminous Patch Material <br />Bit. Patch Material W/Fiber <br />Mineral Agg. #2 Stone or Slag <br />Coarse Agg. - #9 Spec. <br />Coarse Agg. - #73 Stone or Slag <br />Coarse Agg. - #73 Gravel <br />Fine Agg. - #23 or #24 <br />15,000 <br />15,000 <br />5,000 <br />5,000 <br />5,000 <br />6,000 <br />3,000 <br />3,000 <br />1,000 <br />1,000 <br />15,000 <br />5,000 <br />5,000 <br />5,000 <br />1,500 <br />Coarse Agg. - Crusher Run 7/16 XO 1,500 <br />Ready Mix Concrete Class A - Limestone 600 <br />Ready Mix Concrete Class A Slag <br />Ready Mix Concrete, Class B <br />Portland Cement <br />Bituminous Material - Tack <br />Bituminous Mat. - Dust Palative <br />Emulsified Asphalt <br />Fiber Reinforced Asphalt Membrane <br />Joint/Crack Main. Mat. <br />Joint Sealant and Stress Absorbing <br />Membrane - Laid in Place <br />1,000 <br />150 <br />3,000 <br />100 <br />175,000 <br />600,000 <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />ton <br />cy <br />cy <br />cy <br />bags <br />ton <br />gal <br />gal <br />80,000 gal <br />50 ton <br />In a letter to the Board, Mr. Bill Penn, Director, Division of <br />Transportation, recommended that the following awards for Street <br />materials be approved: <br />ITEM NO. PRIMARY SUPPLIER <br />1. <br />2. <br />3. <br />4. <br />5. <br />6 <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />18. <br />19. <br />20. <br />21. <br />22. <br />Rieth-Riley Construction <br />Rieth-Riley Construction <br />Rieth-Riley Construction <br />Walsh & Kelly, Inc. <br />Walsh & Kelly, Inc. <br />Michiana Paving <br />Rieth-Riley Construction <br />Michiana Paving <br />Michiana Paving <br />Michiana Paving <br />Levy Company <br />St. Joe Materials <br />Levy Company <br />Vulcan Materials <br />St. Joe Materials <br />Levy Company <br />Hass Concrete <br />Hass Concrete <br />Hass Concrete <br />Hass Concrete <br />Elf Asphalt <br />Elf Asphalt <br />SECONDARY SUPPLIER <br />Walsh & Kelly, Inc. <br />Walsh & Kelly, Inc. <br />Walsh & Kelly, Inc. <br />Rieth-Riley Construction <br />Rieth-Riley Construction <br />Rieth-Riley Construction <br />Walsh & Kelly, Inc. <br />Rieth-Riley Construction <br />Rieth-Riley Construction <br />Rieth-Riley Construction <br />Vulcan Materials <br />St. Joe Materials <br />Vulcan Materials <br />Rose Fuel <br />1 <br />1 <br />