My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/14/92 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1992
>
12/14/92 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:21:29 PM
Creation date
9/21/2016 11:17:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/14/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING DECEMBER 14, 1992 <br />421 <br />1 <br />1 <br />OPENING OF QUOTATIONS - WATERPROOFING OF COVELESKI REGIONAL <br />STADIUM <br />Mr. Leszczynski noted that this was the date set for the <br />receiving and opening of sealed Quotations for the above referred <br />project which includes the waterproofing of all exterior concrete <br />masonry walls at the Coveleski Regional Baseball Stadium. The <br />following Quotations were opened and read: <br />ADVANCED MASONRY CONSTRUCTION COMPANY, INC. <br />53266 Bonvale Drive <br />South Bend, Indiana 46635 <br />Quotation was signed by Mr. Thomas J. Lykowski, President. <br />QUOTATION: $13,867.00 <br />MIDLAND ENGINEERING COMPANY <br />52369 U.S. 33 North <br />South Bend, Indiana <br />Quotation was signed by Mr. <br />QUOTATION: $24,690.00 <br />Charles W. Frazier, President. <br />�RAMENDA MASONRY COMPANY, INC. <br />54889 Lexington Avenue <br />South Bend, Indiana 46628 <br />Quotation was signed by Mr. Ronald T. Lockwood, President. <br />QUOTATION: $28,200.00 <br />CASTEEL CONSTRUCTION CORPORATION <br />23186 West Ireland Road <br />South Bend, Indiana <br />Quotation was signed by Mr. R.V. Casteel, President. <br />QUOTATION: $23,892.00 <br />Upon a motion made by Mr. Caldwell, seconded by Mr. Leszczynski <br />and carried, the above Quotations were referred to the Division <br />of Engineering for review and recommendation. <br />OPENING OF QUOTATIONS - BLOCK WASH REPAIRS - COVELESKI REGIONAL <br />STADIUM <br />This was the date set for the receiving and opening of sealed <br />Quotations for the above referred to project which involves <br />adding a sheet metal flashing on the exterior concrete masonry <br />walls of the Coveleski Regional Stadium. The following <br />Quotations were opened and read: <br />ADVANCED MASONRY CONSTRUCTION COMPANY, INC. <br />53266 Bonvale Drive <br />South Bend, Indiana 46635 <br />Quotation was signed by Mr. Thomas J. Lykowski, President. <br />QUOTATION: $7,482.00 <br />MIDLAND ENGINEERING COMPANY <br />52369 U.S. 33 North <br />South Bend, Indiana <br />Quotation was signed by Mr. Charles W. Frazier, President. <br />QUOTATION: $9,555.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.