My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/14/92 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1992
>
12/14/92 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:21:29 PM
Creation date
9/21/2016 11:17:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/14/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />DECEMBER 14, 1992 <br />CASTEEL CONSTRUCTION CORPORATION <br />23086 West Ireland Road <br />South Bend, Indiana <br />Quotation was signed by Mr. R.V. Casteel, President. <br />QUOTATION: $19,800.00 <br />RAMENDA MASONRY COMPANY, INC. <br />54889 Lexington Avenue <br />South Bend, Indiana 46628 <br />Quotation was signed by Mr. Ronald T. Lockwood, Project <br />Manager. <br />QUOTATION: $11,600.00 <br />COMBINED BID - WATERPROOFING AND BLOCK WALL REPAIRS - <br />COVELESKI REGIONAL STADIUM <br />It is noted that the Board is in receipt of one (1) bid for <br />the combined projects indicated above as follows: <br />MIDLAND ENGINEERING COMPANY <br />52369 U.S. 33 North <br />South Bend, Indiana <br />Quotation was signed by Mr. Charles W. Frazier, President. <br />QUOTATION: $33,900.00 <br />Upon a motion made by Mr. Caldwell, seconded by Mrs. Mueller and <br />carried, the above Quotations were referred to the Division of <br />Engineering for review and recommendation. <br />OPENING OF QUOTATIONS - REPAIR OF PLAYING FIELD WALL - COVELESKI <br />REGIONAL STADIUM <br />Mr. Leszczynski advised that this was the date set for the <br />receiving and opening of sealed Quotations for the above referred <br />to project which includes the repair of weathered sections of the <br />top of the playing field perimeter wall in front of the seating <br />areas from just beyond third base to just beyond first base, <br />including the umpires tunnel walls. The work will consist of <br />removal of weathered and loosened topping from the wall, <br />preparation of the exposed surface, placement of a new topping to <br />clean, straight and smooth lines, repair of pipe safety rail and <br />backstop netting support inserts in the wall. The following <br />sealed Quotations were opened and read: <br />LIBERTY FLOORS & COATING COMPANY <br />30879 U.S. 20 West <br />Elkhart, Indiana 46514 <br />Quotation was signed by Mr. Andrew Harwood, President. <br />QUOTATION: $18,118.99 <br />KASER-SPRAKER CONSTRUCTION, INC. <br />25487 West State Road 2 <br />South Bend, Indiana 46619 <br />Quotation was signed by Mr. Gary L. Spraker, President. <br />QUOTATION: $22,152.00 <br />y ZIOLKOWSKI CONSTRUCTION, INC. <br />P.O. Box 1106 <br />South Bend, Indiana 46624 <br />Quotation was signed by Mr. Ben Ziolkowski, President. <br />QUOTATION: $20,704.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.