My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/11/92 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1992
>
05/11/92 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:24:34 PM
Creation date
9/20/2016 1:59:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/11/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15 <br />REGULAR MEETING MAY 11, 1992 <br />Payment: <br />- All accounts turned over for Recovery/Collection will be <br />paid directly to Burns, Inc. If an account is paid <br />through the City after it has been submitted to Burns, <br />Inc. for Recovery/Collection it will be charged to the <br />City's account as if it was paid to Burns, Inc. <br />Upon a motion made by Mr. Leszczynski, seconded by Mrs. Mueller <br />and carried, the above Proposals were referred to the Fire <br />Department for review and recommendation. <br />OPENING OF QUOTATIONS - INSTALLATION OF NEW SAMPLING GRINDER <br />PUMP IN THE 96" EFFLUENT PIPE - WASTEWATER TREATMENT PLANT <br />It was noted that this was the date set for the receiving and <br />opening of sealed Quotations for the installation of a new <br />sampling grinder pump in the 96" effluent pipe at the Bureau of <br />Wastewater located at 3113 Riverside Drive. <br />The following Quotations were received and read: <br />ZIMMERMAN INDUSTRIAL PIPING. INC. <br />1117 North Clay Street <br />Mishawaka, Indiana 46545 <br />Quotation was submitted by Mr. Robert Kelsey. <br />QUOTATION: $8,261.00 <br />DELCO <br />PIPING CONTRACTORS & ENGINEERS <br />2720 East Michigan Boulevard <br />Michigan City, Indiana 46360 <br />Quotation was submitted by Mr. James L. Fisher, <br />Vice -President. <br />QUOTATION: $8,870.00 <br />Exceptions: <br />- "Existing" cross members are not <br />accommodate proposed assembly. <br />- Stainless steel guide assembly is <br />Propose using galvanized. <br />- Any work within effluent pipe is <br />to cantilever pump assembly from <br />positioned to <br />not available. <br />very dangerous. Propose <br />concrete box structure. <br />KASER-SPRAKER CONSTRUCTION INC. <br />P.O. Box 3605 <br />35487 West State Road 2 <br />South Bend, Indiana 46619 <br />Quotation submitted by Mr. Gary L. Spraker, President. <br />QUOTATION: $9,746.00 <br />Voluntary Alternate #1: <br />Delete the additional angle bracing on the existing steel <br />supports inside the 96" pipe and strengthen the new pump <br />guides to cantilever the pump into the effluent flow from <br />the concrete chamber above. DEDUCT: $670.00 <br />Voluntary Alternate #2: <br />Surface mount the electrical conduit for the new pump on <br />the concrete wall of the Chlorination/Dechlorination <br />Building and extend to the new motor control and disconnect <br />1 <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.