Laserfiche WebLink
SPECIAL MEETING DECEMBER 6, 1994 <br />General Construction (Add) <br />G-1 Add escalator with step width of 32" $335,000.00 <br />G-17 Add white maple veneer plywood paneling on walls and doors $ 24,000.00 <br />of Vestibules D-213 and 218 <br />G-18 Add escalator with step width of 24" $283,000.00 <br />Mechanical Construction (Deduct) <br />M-1 Provide standard pneumatic controls in lieu of direct $ 29,000.00 <br />digital controls <br />M-2 Delete VAV boxes with AHU's 11 and 12 and revise controls $ 19,000.00 <br />M-3 Associated cost for Alternate M-2 if M-1 is accepted $ 34,000.00 <br />M-4 Delete humidification system with AHU-13 $ 3,600.00 <br />M-5 NO CHANGE <br />Electrical Construction (Deduct <br />E-1 Delete communication conduit from Storage E-119 to $ 17,000.00 <br />Building "B" <br />E-2 Delete 208V twist lock outlets in Meeting Rooms A,B,C,D $ 2,000.00 <br />E-3 Delete all sound system rough -ins $ 2,300.00 <br />E-4 Delete VISA wall sconces $ 8,200.00 <br />E-5 Delete dimmer system rough -ins and provide switches $ 12,000.00 <br />E-6 Delete downlight at top of skylight in Rotunda D-216 $ 1,200.00 <br />E-7 Delete exterior walkway lights along west wall of Street $ 4,200.00 <br />Level Area "D" <br />VERKLER, INC. <br />4406 Technology Drive <br />South Bend, Indiana <br />Bid was signed by Mr. Fred Lusk, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $2,828,000.00 <br />Alternates <br />General Construction (Deduct) <br />G-2 Delete folding partitions between Meeting Rooms A, B, C, D $ 51,000.00 <br />G-3 Delete window between Jewelry E-108 and Corridor E-121 $ 2,500.00 <br />