My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/06/94 Board of Public Works Special Meeting Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1994
>
12/06/94 Board of Public Works Special Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:21:17 PM
Creation date
9/13/2016 11:12:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/6/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL MEETING <br />DECEMBER 6. 1994 <br />A Special meeting of the Board of Public Works was convened at 1:35 p.m. on Tuesday, December <br />6, 1994, by Board President John E. Leszczynski, with Mr. Leszczynski, Mr. James R. Caldwell and <br />Mrs. Jenny Manier present. Also present was Board Attorney Anne Bruneel. <br />OPENING OF BIDS - CENTURY CENTER REMODELING - PROJECT NO. 94-83 <br />This was the date set for receiving and opening of sealed bids for the above referred to project. The <br />Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News <br />which were found to be sufficient. The following bids were opened and publicly read: <br />CASTEEL CONSTRUCTION CORPORATION <br />23186 W. Ireland Road <br />South Bend, Indiana <br />Bid was signed by Mr. R.V. Casteel, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $2,569,000.00 <br />Alternates <br />General Construction (Deduct) <br />G-2 Delete folding partitions between Meeting Rooms A, B, C, D <br />G-3 Delete window between Jewelry E-108 and Corridor E-121 <br />G-4 Delete window between Elevator Lobby E-306 and Skywalk <br />G-5 Delete window between Weaving E-310 and Corridor E-327 <br />G-6 Delete vertical strip windows facing River and assoc. mech./elec. <br />G-7 Delete ceiling grid in Sculpture D-101 and Ceramic D-105 <br />G-8 Delete Polish Room E-108A <br />G-9 Delete casework in Weaving E-310 <br />G-10 Exchange polymer paint for standard paint in Meeting <br />Rooms E-109, 112, 115, 117 <br />G-11 Substitute limestone pavers for glass block pavers in <br />Rotunda D-216 <br />G-12 Provide self supporting skylights in lieu of skylight/space frame <br />in Rotunda D-216 <br />G-13 Delete Rooms D-101, 102, 103, 105, 106, 107, 108, 148 <br />G-14 Delete demolition and construction in River Level Area E <br />G-15 Perform demolition and partial construction in Meeting Rooms <br />E-109, 112, 115, 117 <br />$ 54,000.00 <br />$ 1,100.00 <br />$ 2,600.00 <br />$ 2,400.00 <br />$175,000.00 <br />$ 4,000.00 <br />$ 9,000.00 <br />$ 1,000.00 <br />$ 1,600.00 <br />NO CHANGE <br />$ 47,000.00 <br />$110,000.00 <br />$255,000.00 <br />$ 88,000.00 <br />G-16 Delete stainless steel exterior plaque $ 12,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.