Laserfiche WebLink
SPECIAL MEETING DECEMBER 6; 1994 <br />G-4 Delete window between Elevator Lobby E-306 and Skywalk $ 1,800.00 <br />G-5 Delete window between Weaving E-310 and Corridor E-327 $ 1,800.00 <br />G-6 Delete vertical strip windows facing River and assoc. mech./elec. $217,000.00 <br />G-7 Delete ceiling grid in Sculpture D-101 and Ceramic D-105 $ 50,000.00 <br />G-8 Delete Polish Room E-108A $ 3,000.00 <br />G-9 Delete casework in Weaving E-310 $ 2,000.00 <br />G-10 Exchange polymer paint for standard paint in Meeting $ 2,000.00 <br />Rooms E-109, 112, 115, 117 <br />G-11 Substitute limestone pavers for glass block pavers in $ 10,000.00 <br />Rotunda D-216 <br />G-12 Provide self supporting skylights in lieu of skylight/space frame $ 1,200.00 <br />in Rotunda D-216 <br />G-13 Delete Rooms D-101, 102, 103, 105, 106, 107, 108, 148 $133,000.00 <br />G-14 Delete demolition and construction in River Level Area E $321,000.00 <br />G-15 Perform demolition and partial construction in Meeting Rooms $ 90,000.00 <br />E-109, 112, 115, 117 <br />G-16 Delete stainless steel exterior plaque $ 10,000.00 <br />General Construction (Add) <br />G-1 Add escalator with step width of 32" $366,000.00 <br />G-17 Add white maple veneer plywood paneling on walls and doors $ 5,000.00 <br />of Vestibules D-213 and 218 <br />G-18 Add escalator with step width of 24" $360,000.00 <br />Mechanical Construction (Deduct <br />M-1 Provide standard pneumatic controls in lieu of direct $ 29,000.00 <br />digital controls <br />M-2 Delete VAV boxes with AHU's 11 and 12 and revise controls $ 20,000.00 <br />M-3 Associated cost for Alternate M-2 if M-1 is accepted $ 34,000.00 <br />M-4 Delete humidification system with AHU-13 $ 3,500.00 <br />Electrical Construction (Deduct) <br />E-1 Delete communication conduit from Storage E-119 to $ 17,000.00 <br />Building "B" <br />E-2 Delete 208V twist lock outlets in Meeting Rooms A, B, C, D $ 1,700.00 <br />