Laserfiche WebLink
` usfA..4 <br />REGULAR MEETING AUGUST 9. 1999 <br />RIETH RILEY CONSTRUCTION COMPANY, INC. <br />Post Office Box 1776 <br />South Bend, Indiana 46634 <br />Bid was signed by Mr. Mark Nagle <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: <br />Total Cost Base Bid $68,095.25 <br />Total Cost Alt. A $35,698.25 <br />Upon a motion made by Mr. Powell, seconded by Ms. Roemer and carried, the above bids were <br />referred to the Division of Engineering for review and recommendation. <br />AWARD QUOTATION - MORRIS PERFORMING ARTS CENTER - SITE DRAINAGE AND <br />SEWERS - PROJECT NO.98-25-9 <br />Mr. Carl P. Littrell, City Engineer, advised the Board that on July 26,1999, quotations were received <br />and opened for the above referred to project. After reviewing those quotations, Mr. Littrell <br />recommends that the Board award the contract to HRP Construction, 5777 Cleveland Road, South <br />Bend, Indiana in the amount of $41,690.00. Therefore, Ms. Roemer made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Mr. Powell seconded <br />the motion which carried. <br />AWARD QUOTATION - MORRIS PERFORMING ARTS CENTER - PORTLAND CEMENT <br />CONCRETE PAVING AND CURBS - PROJECT NO. 98-25-10 <br />Mr. Carl P. Littrell, City Engineer, advised the Board that on July 6, 1999, quotations were received <br />and opened for the above referred to project. After reviewing those quotations, Mr. Littrell <br />recommends that the Board award the contract to Kaser Spraker Construction, 25487 State Road <br />2, South Bend, Indiana in the amount of $29,378.00. Therefore, Ms. Roemer made a motion that <br />the recommendation be accepted and the quotation be awarded as outlined above. Mr. Powell <br />seconded the motion which carried. <br />AWARD QUOTATION- MORRIS PERFORMING ARTS CENTER - FLEXIBLE PAVING AND <br />SURFACING - PROJECT NO. 98-25-11 <br />Mr. Carl P. Littrell, City Engineer, advised the Board that on July 26,1999, quotations were received <br />and opened for the above referred to project. After reviewing those quotations, Mr. Littrell <br />recommends that the Board award the contract to Walsh & Kelly, 24358 State Road 23, South Bend, <br />Indiana in the amount of $44,000.00, which is the base quote of $45,000.00 with a voluntary deduct <br />of $1,000.00. Therefore, Ms. Roemer made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Mr. Powell seconded the motion which carried. <br />APPROVE CHANGE ORDER - LEIGHTON PLAZA - CONCRETE WORK - PROJECT NO.97- <br />57-4 <br />Mr. Caldwell advised that Mr. Carl Littrell, City Engineer, has submitted Change Order No. 3- <br />03.70C.6 on behalf of Casteel Construction, 23186 West Ireland Road, South Bend, Indiana <br />indicating that the Contract amount be increased $87,971.25 for a new Contract sum including this <br />Change Order in the amount of $1,911,017.83. Upon a motion made by Ms. Roemer, seconded by <br />Mr. Powell and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER - LEIGHTON PLAZA -GENERAL CONSTRUCTION -PROJECT <br />NO. 97-57-4 <br />Mr. Caldwell advised that Mr. Carl Littrell, City Engineer, has submitted Change Order No. 3- <br />03.70C.7 on behalf of Casteel Construction, 23186 West Ireland Road, South Bend, Indiana <br />indicating that the Contract amount be increased $18,578.76 for a new Contract sum including this <br />Change Order in the amount of $953,805.48. Upon a motion made by Ms. Roemer, seconded by Mr. <br />Caldwell and carried, the Change Order was approved. <br />