Laserfiche WebLink
REGULAR MEETING AUGUST 9. 1999 <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by Mr. Kevin Kelly, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted , <br />BID: $67,433.75 <br />Upon a motion made by Mr. Caldwell, seconded by Ms. Roemer and carried, the above bids were <br />referred to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS - WESTSIDE PARTNERSHIP CENTER - CURB. SIDEWALK AND <br />APPROACH REPAIRS - PROJECT NO. 99-32 <br />This was the date set for receiving and opening of sealed bids for the above referred to project. The <br />Cleric tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News <br />which were found to be sufficient. The following bids were opened and publicly read: <br />BATTEAST CONSTRUCTION COMPANY, INC. <br />430 East LaSalle <br />South Bend, Indiana <br />Bid was signed by Mr. Robert Batteast, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: <br />Total Cost Base Bid $75,599.00 <br />Total Cost Alt. A $39,279.00 <br />WALSH & KELLY, INC. <br />430 East LaSalle <br />South Bend, Indiana <br />Bid was signed by Mr. Kevin Kelly, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: <br />Total Cost Base Bid $79,950.25 <br />Total Cost Alt. A $40,013.00 <br />NILES CONCRETE SAWING & CONSTRUCTION. INC. <br />2580 East Detroit Road <br />Niles, Michigan 49120 <br />Bid was signed by Mr. Daniel Kulwicki, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: <br />Total Cost Base Bid $83,181.40 <br />Total Cost Alt. A $43,822.60 <br />