My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/09/99 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1999
>
08/09/99 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:14:23 PM
Creation date
8/31/2016 11:24:30 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/9/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING AUGUST 9. 1999 <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by Mr. Kevin Kelly, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted , <br />BID: $67,433.75 <br />Upon a motion made by Mr. Caldwell, seconded by Ms. Roemer and carried, the above bids were <br />referred to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS - WESTSIDE PARTNERSHIP CENTER - CURB. SIDEWALK AND <br />APPROACH REPAIRS - PROJECT NO. 99-32 <br />This was the date set for receiving and opening of sealed bids for the above referred to project. The <br />Cleric tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County News <br />which were found to be sufficient. The following bids were opened and publicly read: <br />BATTEAST CONSTRUCTION COMPANY, INC. <br />430 East LaSalle <br />South Bend, Indiana <br />Bid was signed by Mr. Robert Batteast, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: <br />Total Cost Base Bid $75,599.00 <br />Total Cost Alt. A $39,279.00 <br />WALSH & KELLY, INC. <br />430 East LaSalle <br />South Bend, Indiana <br />Bid was signed by Mr. Kevin Kelly, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: <br />Total Cost Base Bid $79,950.25 <br />Total Cost Alt. A $40,013.00 <br />NILES CONCRETE SAWING & CONSTRUCTION. INC. <br />2580 East Detroit Road <br />Niles, Michigan 49120 <br />Bid was signed by Mr. Daniel Kulwicki, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: <br />Total Cost Base Bid $83,181.40 <br />Total Cost Alt. A $43,822.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.