.ow"'!2 <br />REGULAR MEETING <br />Bid was signed by Mr. Roman Lovisa, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was not completed <br />Five per cent (5%) Bid Bond was submitted <br />JANUARY 11, 1999 <br />BID: $140,910.00 - Bid Package 98-25-5.9B - Ceramic Tile and <br />Bid Package 98-25-5.9C - Terrazzo - (Combination Bid) <br />$ 37,729.00 - Bid Package 98-25-5.9B - Ceramic Tile <br />$115,181.00 - Bid Package 98-25-5.9C - Terrazzo <br />DUPONT FLOORING SYSTEM <br />35801 Mound Road <br />Sterling Heights, Michigan 48310 <br />Bid was signed by Mr. William Checkley <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $173,960.00 - Bid Package 98-25-5.9D - Flooring <br />Upon a motion made by Ms. Roemer, seconded by Mr. Caldwell and carried, the above bids were <br />referred to Verkler, Inc., 4406 Technology Drive, South Bend, Indiana for review and <br />recommendation. <br />AWARD BIDS - MORRIS PERFORMING ARTS CENTER - PROJECT NO. 98-25-5 <br />Mr. Fred Lusk, Verkler, Inc., 4406 Technology Drive, South Bend, Indiana, advised the Board that <br />on December 16, 1999, bids were received and opened for the above referred to project. After <br />reviewing those bids, Mr. Lusk recommends that the Board award bids as follows: <br />Bid Package <br />Bidder <br />Amount <br />98-25-5.5A - Misc. Metal Fabrications <br />- Mat'1 <br />98-25-5.5B - Misc. Metal Fabrications <br />- Labor <br />General Steel Fabricating Co., Inc. <br />$ 719,700.00 <br />98-25-5.6 - General Construction <br />Reinke Construction <br />$ 913,000.00 <br />98-25-5.7B - Roofing <br />Midland Engineering <br />$ 332,000.00 <br />98-25-5.9A - Plaster, Drywall, <br />Acoustical <br />Gibson -Lewis, LLC <br />$ 478,375.00 1 <br />98-25-5.14A - Elevators <br />Abell Elevator Int'l. <br />$ 55,234.00 <br />98-25-5.15A - Mechanical/Plumbing <br />Slutsky-Peitz Plumbing/Heating <br />$1,348,900.00 <br />98-25-5.15B - Fire Protection <br />McDaniel Fire System <br />$ 61,514.00 <br />98-25-5.15C - Temperature Controls <br />Johnson Controls, Inc. <br />$ 93,360.00 <br />F98-25-5,15D - Test/Balance <br />Fluid Dynamics <br />$ 14,275.00 <br />Therefore, Ms. Roemer made a motion that the recommendation be accepted and the bids be awarded <br />as outlined above. Mr. Caldwell seconded the motion which carried. <br />1 <br />1 <br />