My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/01 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2001
>
10/08/01 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:12:34 PM
Creation date
8/25/2016 10:51:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/8/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEEXING OCTOBER 8, 2001 <br />..�-p KASER-SPRAKER CONSTRUCTION, INC. <br />21481 Nest State Road 2 <br />South Bend, Indiana 46619 <br />Quotation was submitted by Mr. Gary Spraker <br />QUOTATION: $32,505.00 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Inks and carried, the above Quotations were <br />referred to the Division of Engineering for review and recommendation. <br />OPENING OF QUOTATIONS - SEWER RELOCATION - WASTEWATER TREATMENT <br />PLANT - PROJECT NO. 101-066 <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referred to project. The following Quotations were opened and read: <br />CENTERLINE MECHANICAL CONTRACTING, INC. <br />1717 North Commerce Drive <br />South Bend, Indiana 46628 <br />Quotation was submitted by Mr. Randall Stoner <br />QUOTATION: $17,559.00 <br />HRP CONSTRUCTION, INC. <br />5777 Cleveland Road <br />South Bend, Indiana 46628 <br />Quotation was submitted by Mr. Paul Fallon <br />QUOTATION: $29,724.00 <br />ZIMMERMAN INDUSTRIAL PIPING, INC. <br />1117 North Clay <br />Mishawaka, Indiana 46545 <br />Quotation was submitted by Zimmerman Industrial Piping, Inc. <br />QUOTATION: $31,622.00 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Inks and carried, the above Quotations were <br />referred to Environmental Services for review and recommendation. <br />OPENING OF QUOTATIONS - RE -QUOTE - CENTURY CENTER COLUMN REPAIR - <br />PROJECT NO. 101-067 <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referred to project. The following Quotations were opened and read: <br />H.G. CHRISTMAN CONSTRUCTION COMPANY, INC. <br />850 South Fellows <br />South Bend, Indiana 46601 <br />Quotation was submitted by Mr. Robert A. Bash <br />QUOTATION: $32,900.00 <br />CASTEEL CONSTRUCTION CORPORATION <br />23186 West Ireland Road <br />South Bend, Indiana 46614 <br />
The URL can be used to link to this page
Your browser does not support the video tag.